Installing for the fast-growing British School Netherlands

Dekker Van Geest of Monster is an installation contractor with 35 years’ experience in school construction. Having started out carrying out installation work for municipal institutions in Westland and The Hague, over the years it has built up extensive experience in improving ventilation systems in existing school buildings. This subsidiary of Batenburg also embraced the Frisse Scholen concept from the outset. That experience has now been put to use at a campus of the prestigious British School Netherlands in The Hague.
British School Netherlands (BSN) has one of its campuses on the southern edge of Leidschenveen. In 2010, the first teaching building for primary education was completed on the 3 ha site, together with a sports hall and an administration building with a nursery. In recent years, BSN first refurbished its existing 9,567 m² and then added a further 7,202 m² of new-build space. This has enabled the international school to extend its provision across the full learning continuum for children aged 3 to 18. The expansion comprises a secondary school with flexible learning spaces and roof terraces, a second sports hall and an ‘assembly dome’: a distinctive space where pupils can eat, work and give presentations.
Subcontractor
Gerard Hegge, director of Dekker van Geest, briefly outlines the two-stage process: “We were first asked to upgrade the installations in the existing buildings, for which specifications had already been prepared. That was fine in itself. We successfully achieved Frisse Scholen Class B here and made the installation concept more sustainable. This put us in a strong position to continue with the new-build phase. We worked closely with KVMC installation adviser on this. We contributed to the design of this second phase, which also meets Class B. Our extensive experience adds significant value to the design process. We were also a subcontractor on this project, bringing in a partner company to carry out the electrical installations.”
Refurbishment
Refurbishment is an early step for a building dating from 2010, but the main driver was the need to reorganise the space and increase teaching capacity. Ronald van Bergenhenegouwen, who successfully completed the project for Dekker Van Geest, says: “The building had a balanced ventilation system based on the 2003 Building Decree. It needed upgrading to meet Frisse Scholen Class B. New air handling units and heat pumps were installed on the roof. Ducts run from the roofs to the suspended ceilings in the corridors and classrooms, where sound-attenuating transfer air grilles were installed. As in the new-build section, air is supplied through fabric ducting. As with many refurbishment projects, we had to work around structural constraints, so you have to be creative with your solutions. Some of the air ducts, for example, were partly cast into the floors, so work could only start at the outlet.”
DALI
The new-build section was also designed with standalone air-to-water heat pumps for heating and cooling. Van Bergenhenegouwen says: “These efficient heat pumps, together with the air handling units, are located in the taller black sections between the old and new buildings. The riser cores are also housed there. The ventilation system throughout the new-build section is controlled by CO₂ sensors. Helvar’s lighting management system has been installed, with daylight-responsive luminaires.” BSN is another excellent reference for Dekker Van Geest. Hegge says: “Schools remain our unique selling point. If you’re good at something, word of mouth takes care of itself.”
Question about this story? Ask your question
Who worked on it
British School Netherlands in Den Haag
- separate contractorDekker Van Geest
- Building services consultantKVMC
- lichtmanagementsysteemHelvar
Keep following this
Get an email when a new story is published. No account needed.
- ProjectBritish School Netherlands
- SubjectFrisse Scholen
- CompanyDekker Van Geest
- CompanyKVMC
- CompanyHelvar