Greater comfort with lower energy consumption. It may seem contradictory, but the evidence shows it can be done! “Every day, HVAC renovation projects are completed that deliver noticeably greater comfort and a healthier indoor climate, while also achieving significant energy savings,” says Dirk Bijlaart, Technical Advice Manager at Belimo. “Our innovative technologies play a key role in this. With our RetroFIT+ programme, we quickly transform ‘grey’ HVAC installations into ‘green’ climate systems, without major modifications and/or high costs, putting sustainable upgrades within reach for every building.” The fire station in Breda is a fine example.

“The Municipality of Breda manages various types of buildings, including premises for education, arts and culture. It also manages buildings providing services, such as libraries and fire stations,” says Technical Property Manager Louis Bouhuys. “This helps keep the buildings in use for a long time. We also actively look for improvements as part of our multi-year maintenance plans, always with sustainability in mind.” The fire station in Breda is a good example. A mini-tender was issued for the project. “The initial brief was to replace the pumps,” says Remco Cornelissen, Commercial Manager at Van Dijnsen. Belimo joined the discussions at an early stage. “We worked from the schematic diagram, focusing in particular on the hydraulic modifications,” says Bijlaart. “We also looked at their impact on the measurement and control technology. During the installation phase, we advised on how the systems should be installed. We also provided support with commissioning.”

In the new system, balancing has been replaced by setting.

Monitoring and adjustment

Projects for the Municipality of Breda are always budgeted according to a set value, says Bouhuys. “That value determines the procurement process, and of course we comply with our procurement conditions. In this case, we invited three companies to submit a proposal. Van Dijnsen came back with the best proposal and offered something extra, enabling us to improve the building’s sustainability straight away.” Cornelissen: “As soon as the project was awarded, we proactively began discussions with the Municipality of Breda to identify opportunities for optimisation and sustainable improvements. We immediately involved our regular partner Belimo, represented by Dirk Bijlaart. This resulted in modifications to the hydraulic system. Several control valves were replaced with Belimo Energy Valves™. This delivers substantial energy savings for the client and makes the installation much more stable. In addition, the use of Belimo Energy Valves™ makes the installation future-proof, allowing energy consumption to be monitored throughout the system and adjusted wherever necessary.” Bijlaart: “In our experience, this approach can always deliver energy savings of between 30 and 60 per cent.”

Breda fire station: old and new systems, with several control valves replaced by Belimo Energy Valves™.

If you can measure it, you can manage it

“The fire station’s original schematic diagram dated back to 1999,” says Marc Boltjes, Work Planner and Draughtsman at Van Dijnsen. “There was no digital version available, so I first had to redraw the diagram by hand. We could then select and calculate the new schematic based on the valves and pumps. The challenge was developing the new design.” Cornelissen: “In the past, we often controlled systems based on temperatures, and it was enough for the Delta-T to be such that everyone was warm. Today, however, we look at where the energy is flowing and where the installation could or should be optimised. After all, you can only take action once you have insight into the current situation. Belimo’s new control ball valves are an excellent fit with this approach.”

“During commissioning, we check how much each circuit specifically needs to deliver,” says Bijlaart. “Using a laptop or smartphone with the Belimo App, all the data can then be entered directly, and a Belimo Energy Valve™ can be commissioned in just two minutes.” Boltjes: “In the new system, balancing has been replaced by setting. The combination of a laptop, smartphone and Belimo App works perfectly.” 

Using a laptop or smartphone with the Belimo App, all the data can be entered directly, and a Belimo Energy Valve™ can be commissioned in just two minutes.

Small changes, big results

“Belimo and Van Dijnsen have been partners for a long time,” says Cornelissen. “Especially on projects involving hydraulic challenges.” Bijlaart: “Investments with a payback period of less than five years are mandatory. So when, for example, the pumps in an HVAC installation are replaced because electricity consumption is too high, the rest of the installation is often examined more closely and hydraulic modifications are also made. This means the entire system can be optimised with just a few small changes. The fire station in Breda is a fine new example.”

A leader in sustainable upgrades

A few months after completion, Bouhuys looks back on the project with satisfaction. “I think everyone worked well together. All the parties kept each other well informed, and the handover to the maintenance contractor also went smoothly.” Bijlaart: “The Municipality of Breda is doing a tremendous job and is something of a leader when it comes to improving the sustainability of its buildings. I hope more buildings will be tackled in this way in the future, so that even more energy can be saved.” Bouhuys: “If there is budget for a particular project and we can do something extra to save energy, we will always do so. It also shows our residents that the money they pay is being well spent.”    

A business enquiry for BELIMO? Get in touch

Who worked on it

Breda fire station in Breda, renovation

  1. clientGemeente Breda

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectBreda fire station
  • ThemeSustainable refurbishment of existing buildings
  • SubjectHVAC
  • CompanyGemeente Breda
  • CompanyBELIMO
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.