Air handling

The perfect balance between heritage value and modern comfort

Text Lieke BousemaImage WOLF Energiesystemen

The perfect balance between heritage value and modern comfort

Air handling in listed buildings

Air handling in listed buildings calls for a fundamentally different approach from that used in modern non-residential buildings. Whereas air handling units in hotels, schools and care facilities, for example, can be installed relatively easily on roofs or against façades, this is often prohibited or technically unfeasible in listed buildings. Their architectural and historical value imposes strict constraints, including protected façades, original roof structures and interiors that must not be altered. A committee continually checks that any modifications are appropriate from both an aesthetic and an architectural-history perspective, says Rob olde Scholtenhuis, Technical Adviser at WOLF Energiesystemen. “This means that air-handling solutions must be integrated with care, with minimal visual and physical impact.”

The challenge in listed buildings is to deliver comfort, air quality and energy performance without disturbing their heritage character. “Listed buildings often have limited space for building services,” says olde Scholtenhuis. “Although the technical requirements are becoming increasingly complex, due to stricter regulations and the need for greater energy efficiency, the space available for building services is not increasing. For this reason, we often recommend compact air handling units that fit precisely into existing plant rooms. We also offer modular units, supplied as separate frames and panels and assembled in the plant room. This means that narrow staircases and passageways, for example, are no longer an issue.”

Always tailored to the project

Visible building services are often not permitted in listed buildings, says olde Scholtenhuis. In churches, for example, we also have to deal with high ceilings, and therefore large internal volumes. Churches also experience high peak loads during services or events, while at other times there may be almost nobody in the building. The air handling system must be specifically engineered for these conditions. The same applies where low noise levels and the prevention of vibration are important requirements.” A fundamental principle when renovating or restoring listed buildings is reversibility, he explains. “This means that modifications must be carried out in such a way that they can be undone in the future. Air handling in listed buildings is therefore always tailored to the project.”

The heat recovery unit was delivered to the project as separate frames and panels, then assembled on site. This was a significant advantage given the building’s complex design and narrow arched openings.

From building analysis to climate strategy

This presents no problem for WOLF’s specialists, who respond flexibly to the ventilation needs, challenges and legislation and regulations specific to sectors such as listed buildings. “Every listed-building project starts with a detailed building analysis. On site, we assess the building’s condition, the requirements that need to be met, and the structural and building-services constraints,” says olde Scholtenhuis. “At this stage, we also map the internal volume, materials and occupancy patterns. On this basis, we determine a climate strategy, in which the required temperature and humidity, for example, are important

parameters. This might be to protect a sensitive interior, often featuring extensive woodwork, textiles and fragile paintings. In addition to ventilation, is heating and cooling also required? Are there specific peak loads? And are there factors that could affect maximum energy performance? Based on our findings, we select the most suitable system and the right approach for the project, positioning ourselves as a partner to the parties involved.”

A good example of this comprehensive service can be found in Helmond, where the former Leonarduskerk, a listed national monument, was recently converted into a GP surgery. For the air handling, WOLF selected a compact WOLF CKL heat recovery unit, which was delivered to the project as separate frames and panels and assembled on site. This was a significant advantage given the building’s complex design and narrow arched openings.

A business enquiry for WOLF Energiesystemen? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeHealthy indoor air
  • SubjectAir handling
  • CompanyWOLF Energiesystemen
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.