‘Hybrid buildings and circular construction: a good building services installation can work with both’

Installers are increasingly likely to encounter hybrid buildings and circular construction, both now and in the future. Building services installations need to be adapted accordingly, which calls for a different way of thinking and working. Reusing components is proving a major challenge. How should we approach this?
Circular working is more common in construction than in building services engineering. Materials are removed from a building, cleaned and put back in place. Components from air-conditioning and heating systems can also be reused. There is a desire to recycle as many materials as possible. To do that, as many parts of building services installations as possible could be taken to a hub, where they can be thoroughly refurbished and components replaced where necessary. They can then be reused to build a system with the finish that clients and architects expect. In practice, this is proving quite difficult.
Warranty
It is still difficult to determine the warranty period for an installation fitted with reused building services components. In that respect, we are in a period of transition. When making decisions, we should bear in mind that reuse is better for the environment and cheaper. Sometimes, that means accepting a shorter warranty period for certain components of the installation. The question is how quickly this trend will take hold in building services engineering, but the demand is there.
Prefabrication for hybrid buildings
Hybrid construction also requires extensive coordination. In mid-January, the new DPG Media building was completed in Amsterdam. It is Europe’s largest hybrid timber building complex. This requires considerable engineering and design effort, particularly at the front end. The installer needs to be actively involved, because timber construction, for example, offers fewer structural options. Prefabricated building services modules are adapted to the timber structure, enabling work to be carried out quickly, with less transport and fewer defects. You design a system that fits the structure like a glove. It is different from having ample space above a ceiling in a concrete building. In general, reuse and prefabrication are making our work increasingly efficient and sustainable.
Question about this story? Ask your question
Wie aan Hoofdkantoor DPG Media werkte
- architectTeam V ArchitectuurMentioned in Diverse building services package for new DPG Media headquarters
- climate control and sanitary installationsVan Dorp projectenMentioned in Diverse building services package for new DPG Media headquarters
- air handling unitsOC VerhulstMentioned in Diverse building services package for new DPG Media headquarters
- air handling unitsOC WaterlooMentioned in Diverse building services package for new DPG Media headquarters
Keep following this
Get an email when a new story is published. No account needed.
- ProjectDPG Media headquarters
- ThemeSustainable refurbishment of existing buildings
- SubjectGeneral