Last-minute solutions and bespoke work for installers

A switchboard where the phase sequence needs changing? Or connection problems caused by a lack of space? These are the kinds of issues that can leave installers scratching their heads. Everything is in place, yet a last-minute adjustment is still needed to connect components and get the installation up and running. That is where Elektro Internationaal’s experienced, well-equipped service team can help, for example by modifying copperwork on site.
Elektro Internationaal knows the fundamentals of power distribution inside out. Copperwork is, after all, the basis of the distribution boards that the panel builder from Woerden has been engineering, manufacturing and connecting for more than 40 years. Modifying copperwork on site is an additional area of expertise that few installers know about.

Bespoke solutions for high power ratings
The service engineers at Elektro Internationaal regularly surprise clients by arriving with a mobile copperworking machine to make a modification and solve a problem. Wherever the work needs to be done, the machine enables the service engineer to cut, punch and bend copper busbars up to a maximum size of 120 mm x 10 mm. This delivers valuable bespoke work on high-power panels, where individual copper strips are not sufficient to make the connection.
Bridging the gaps
A common situation when installing distribution panels is that there is not enough height at the installation location to feed the cables into the column with the correct bend radius. Elektro Internationaal’s service engineers solve this by making a bespoke connection box or extension box. They can manufacture one to any required dimensions and even make last-minute changes to meet the customer’s requirements. Sometimes, right at the last moment, it becomes clear that it would be easier to access the connection box from the side rather than from the top of the panel. Or what if the busbar elements that were ordered turn out not to fit? When a new element is ordered, it can often take days, and sometimes even weeks, to arrive. In time-critical situations, Elektro Internationaal provides an on-site solution by using a connection box to bridge the gap between the elements so that they can be connected. This means the project deadline can still be met.

Bespoke transformer connections
Installers can also face challenges when connecting transformers. In various projects, busbar trunking systems are used instead of cables (also known as Canalis systems, flench or busbar). A flexible connection is needed between the transformer and the busbar trunking connection unit. All too often, individual copper strips are used to solve the problem. This can often be done for lower power ratings, but as the power rating increases, so does the number of strips required. The available connection points may also prove insufficient for the large number of strips needed. Since cables cannot always be supported, the finished connection often leaves a lot to be desired visually. Here too, Elektro Internationaal’s service engineers can help with bespoke copperwork. They make flexible connection links on site, which can be fitted between the transformer’s fixed terminals and the busbar trunking. This makes it possible to create a suitable connection for any power rating. For connections with terminals directly above and below one another, extra copperwork is often not needed. But it is common for the phase sequence to need changing, or for the neutral to be in the wrong position. The service team has a solution for this too: a custom-built busbar system to provide the required connection.
All bespoke connection work is, of course, installed, supported and completed in accordance with the applicable standards and safety requirements. It is a fine example of on-site craftsmanship, providing installers with a solution in challenging, time-critical situations.
Een zakelijke vraag aan Elektro Internationaal? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- SubjectGeneral
- CompanyElektro Internationaal