At VSK, Linum is showcasing its latest innovations for the installation industry. The focus is on the heat pump mover and lift, which make installers’ work considerably easier. These solutions make it possible to get heat pumps into position more safely and quickly, allowing installations to be carried out more efficiently.

Linum is responding to growing demand for ease of use on site. Installers are increasingly looking for systems that make installation easier. The Bigfoot frame is a good example. It allows a unit to be installed without penetrating the roof. The installation can be mounted directly onto the frame.

This saves time and reduces the risk of leaks or damage. The system also offers flexibility when expanding. If extra capacity is needed, an additional section of frame can easily be added. This keeps the system scalable and practical to use.

Noise is a major challenge when installing heat pumps. End customers in particular can sometimes be affected by vibration and noise. Linum offers various solutions, including vibration dampers. Vibration-damping properties are also integrated into the Bigfoot frames. This provides natural and effective noise reduction.

The innovations reflect the slogan “Work smart, make impact”. Linum aims to help installers work smarter. By making installations easier and quicker to carry out, they can improve their efficiency. The heat pump mover contributes directly by making transport and positioning easier.

At VSK, Linum demonstrates how practical innovations make a difference on site. Focusing on safety, speed and comfort, the company supports installers at every stage of the installation process.

Een zakelijke vraag aan Linum Europe bv? Get in touch

Full transcript

00:00:06,040 –> 00:00:10,919

The key innovations are actually the heat pump mover and the lift.

00:00:10,919 –> 00:00:13,759

They make it easier for installers to

00:00:13,759 –> 00:00:16,559

get them into position safely too.

00:00:16,559 –> 00:00:20,239

And that means they can also complete their installations more quickly.

00:00:20,239 –> 00:00:22,760

The main trend we’re seeing a lot of is

00:00:22,760 –> 00:00:27,160

that installers are looking for systems that make installation easier.

00:00:27,160 –> 00:00:28,719

The Bigfoot frame is one example.

00:00:28,719 –> 00:00:30,519

It means you don’t have to penetrate the roof,

00:00:30,519 –> 00:00:33,439

so you can place it straight on top.

00:00:33,439 –> 00:00:35,799

Put the unit on it and you can carry on.

00:00:35,799 –> 00:00:39,679

Another advantage is that installing it and

00:00:39,679 –> 00:00:42,679

possibly expanding it are much easier.

00:00:42,679 –> 00:00:45,920

Just buy an extra section of frame and you can carry on.

00:00:45,920 –> 00:00:49,560

Noise is what installers get the most complaints about.

00:00:49,560 –> 00:00:51,640

Or, at least, the customers where they install equipment.

00:00:51,640 –> 00:00:55,000

We have various solutions for that, including vibration dampers.

00:00:55,000 –> 00:00:59,920

Vibration damping is also built into the Bigfoot frames.

00:00:59,920 –> 00:01:02,840

So that immediately provides natural damping.

00:01:02,840 –> 00:01:04,079

You can see that reflected, in a way,

00:01:04,079 –> 00:01:06,840

in our slogan too: Work smart, make impact.

Read the full transcriptCollapse transcript

00:01:06,840 –> 00:01:08,760

It’s about being able to install equipment

00:01:08,760 –> 00:01:11,359

easily, so that installers can

00:01:11,359 –> 00:01:12,560

really

00:01:12,560 –> 00:01:15,159

work efficiently and quickly.

00:01:15,159 –> 00:01:18,159

You can see that with the heat pump mover too: it helps them work faster and more easily.

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeGas-free heating and cooling
  • SubjectGeneral
  • CompanyLinum Europe bv
  • CompanyVSK
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.