General

Plesmanduin The Hague: comfortable living surrounded by greenery

Roodenburg is responsible for the complete sustainability upgrade of Plesmanduin.
Roodenburg is responsible for the complete sustainability upgrade of Plesmanduin.

Plesmanduin is set to become one of The Hague’s most distinctive residential areas. The project in the Duttendel district involves the high-quality renovation and transformation of a former KLM head office and Ministry of Transport and Water Management building, which is also a listed national monument, into a building of more than 60,000 m2 containing spacious, luxuriously finished townhouses, apartments, penthouses and lofts for people of all ages and household types. There is also space for offices and commercial premises. The retention of authentic details, the imposing monumental entrance and the beautiful setting amid greenery give the project added character.

The heat and cold storage plant room is being fitted out beneath the pavilion, on level -2.

Roodenburg is responsible for making Plesmanduin fully sustainable. “Because the listed building dates from 1938 and has a distinctive structure, and because we have extensive renovation experience, developer Impact Vastgoed involved us at a very early stage,” says Arno Schrader, Project Leader at Roodenburg. “From the design stage, we reviewed, contributed to and engineered all the mechanical and plumbing installations required to meet current building regulations (SWK guarantee and BENG). Particular attention was paid to sustainability and noise. Commissioned by Impact Vastgoed, Van Wijnen and Eteck, we are now installing all building services in sections B, C and D, together with our partners, including the associated control and monitoring systems. We are in close contact with the heritage authority throughout. Where possible, we use existing openings in the façade to install grilles, vents and other penetrations, while any new additions are carefully selected. We are also using colour codes to install all the services quickly and without costly errors, while keeping track of this extensive project.” At a later stage, Roodenburg will also build a hotel in section A, which currently houses all the site cabins and canteens. “In addition, three new apartment blocks will be built on the site of the current Saxofoon building.”

The distinctive structure called for alternative installation solutions.

A challenging structure

“Plesmanduin’s core consists of a steel frame encased in concrete,” says Schrader. “A concrete duct also runs down the middle of the corridor, housing various services. Most of the services, however, run alongside the duct and through the future homes.” The double floors are another distinctive feature, he says. They consist of a concrete slab approximately 10 cm thick, a void and a second 10 cm concrete slab. Only between levels -1 and -2 is there a full 200 mm-thick concrete floor. “Because of the unusual structure, we have to check all dimensions on site. Before drilling any openings, we also drill a pilot hole to check that there is no rebar in the way. During construction, discrepancies in dimensions and structure were found compared with the as-built drawings.”

The unusual structure also called for alternative installation solutions. “Our original plan was to install a large air supply and extract duct on the top floor, then use vertical branch ducts to supply and extract air on the floors below. However, this would have taken up so much valuable living space that we decided to install a central shaft in each section and route the ducts alongside the concrete duct to the homes. This means that only a plumbing shaft remains inside each home. Each home has a separate drainage system, thanks to the use of special soil stacks without offset or secondary ventilation pipes.”

Ventilation, heating and cooling

The eight penthouses and lofts will each have their own heat recovery ventilation unit. Ventilation in the other homes will be managed centrally via air handling units beneath the pitched roof, Schrader explains. “Each section (B, C, D1 and D2) will have its own air handling unit, which draws in fresh outdoor air, preconditions it using a changeover coil and supplies it to the homes at the right temperature.” Heating and cooling for the homes will be provided by a heat and cold storage system combined with heat pumps and underfloor heating and cooling. “As Plesmanduin is located above a water extraction area, the wells are being drilled on the opposite side, on Koninginnegracht. To reach them, two directional boreholes were drilled in mid-March: one 180-metre borehole to the cold wells and one 95-metre borehole to the warm wells. The field was then split between the two cold wells and the two warm wells. From there, we will run the pipes across the site to the pavilion, the part of Plesmanduin with the copper roof. The heat and cold storage plant room is being fitted out beneath this pavilion, on level -2. We are installing the source-side heat exchangers, three low-temperature heat pumps, four high-temperature heat pumps and two 4,000-litre buffer tanks, ensuring that residents and other users always have ample hot water. The hotel and new-build development have already been included in the heat and cold storage system and its buffer capacity. The system has been designed and installed to meet the hotel’s and new-build development’s heating and cooling demand without any modifications.”

Question about this story? Ask your question

Who worked on Plesmanduin

  1. complete sustainability upgradeRoodenburgIn this story
  2. developerImpact VastgoedIn this story
  3. subcontractorSchilt bedrijvenMentioned in Sustainable, healthy and comfortable living, working and staying at Plesmanduin
  4. sanitary installationsMohr InstallatietechniekMentioned in Transformations bring surprises. ‘It’s the challenges that make this project so enjoyable’

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectPlesmanduin
  • ThemeHealthy indoor air
  • SubjectGeneral
  • CompanyRoodenburg
  • CompanyImpact Vastgoed
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.