After more than a century of faithful service, the RET depot on Kleiweg in Rotterdam is being replaced. The distinctive brick and steel building is making way for a light, comfortable workshop. The RET’s new, longer metro trains can be maintained here to the highest standard.
Commissioned by Ballast Nedam Industriebouw, Unica is responsible for the building services in the new development. The building services contractor is responsible for delivering all building-related services, including coordinating its own subcontractors and other third parties.

“Compared with the old tram depot, the new building is a straightforward structure designed primarily for functionality,” says Unica project manager Sebastiaan de Kluijver. “The building contains a large workshop, a small office area and a storage area. The workshop is equipped with all the facilities needed to maintain trams and metro trains, including a spray booth, bogie equipment and overhead cranes.” Unlike the old tram depot, where steel trusses created significant obstructions, the new workshop is an open space with only a few walls. The new metro trains, which are 45 metres long, can manoeuvre easily here.
Sustainability and comfort
Based on the specification, Unica developed the drawings using the drawing package specified by RET. The full range of building services is included. The electrical installations comprise the fire alarm and security systems, as well as power supply. On the mechanical side, Unica is installing the sanitary facilities, heating, cooling and ventilation. The compressed air and sprinkler systems are also part of the building services contractor’s scope. De Kluijver says: “To support sustainability, the tram depot uses a heat pump for heating and cooling. The air handling units are fitted with a heat recovery system.” At RET’s request, underfloor heating has been installed throughout the workshop, significantly improving comfort in the hall.

Lean planning
Unica began the installation work at the new tram depot in late 2017. “First, we installed a number of systems in the foundations, including the rainwater drainage,” says De Kluijver. “This was followed by a construction phase, and we were able to get back to work in April/May 2018. Together with the other parties, we planned our work using the lean method. Through lean planning, we considered the best way to approach the installation work. In the end, we decided to carry it out in three construction phases.”
Nearly complete
“The main challenge is the height of the building,” De Kluijver continues. “In some places, we are working about twelve metres above the ground. At that height, for example, we have to secure cable trays.” Unica is now approaching the handover stage. Following the necessary commissioning and testing, the building services work at the new tram depot will be complete by the end of 2018. “A project like this can only succeed if everyone is pulling in the same direction,” concludes De Kluijver. “That is certainly the case here. Working closely with RET and the other parties involved, we are on course for a successful handover.”
Words Patricia van der Beek | Images hfb groep
Question about this story? Ask your question
Wie aan RET-remise Kleiweg werkte
- full-service installerUnicaIn this story
- canal works
Schilt bedrijvenMentioned in RET Kleiweg depot, Rotterdam | Bespoke ductwork system for RET Kleiweg depot - constructionBallast Nedam Industriebouw B.V.Mentioned in RET Kleiweg depot, Rotterdam | Bespoke ductwork system for RET Kleiweg depot
- building servicesUnica Building ProjectsMentioned in RET Kleiweg depot, Rotterdam | Bespoke ductwork system for RET Kleiweg depot
- TROX-componentenTROXMentioned in RET Kleiweg depot, Rotterdam | Bespoke ductwork system for RET Kleiweg depot
Keep following this
Get an email when a new story is published. No account needed.
- ProjectRET-remise Kleiweg
- SubjectGeneral
- CompanyUnica