The pen

‘Get the right people involved at the outset’

Patrick Groeneveld, accountmanager Paneelbouw bij Unica
Patrick Groeneveld, accountmanager Paneelbouw bij Unica

Control cabinets and control panels are at the heart of large electrical installations. Panel building is therefore essential to provide the flexibility and customisation required. The most important factor is the engineering at the outset. If a project has not been properly thought through, it costs time and money. It is a shame that the people with the right skills are becoming increasingly hard to find.

New systems

Developments continue and newer systems are constantly coming onto the market, but fewer and fewer technicians are entering the profession. We all notice this, especially when projects have to be reviewed. For example, because they were not properly thought through at an early stage. It is only then that we realise just how important these people really are. 

Key factors

There is a lot to consider when designing a control panel. Engineering is often based on an installation diagram or control circuit diagram. The control cabinets are designed from there. Several factors have to be taken into account, such as the budget, available space, cables, the location of the distribution board, its required IP rating and suitable materials. How close is the distribution board to the transformer? Do main and sub-distribution boards need to be installed in between to meet the kA rating? How much heat is generated? And what requirements must the components meet?

Mapping out requirements and expectations

Only once everything has been calculated and decided can the materials be ordered and the panels built. An inspector tests all the cabinets and writes an inspection report. The projects the materials are destined for are becoming larger and more complex. Buildings are incorporating more and more technology, controlled by building management systems and read and monitored remotely. All of this will only work as intended if the engineering at the outset is done properly. The client’s expectations and requirements must be clearly mapped out. Every panel is bespoke and depends on the client and the building.

Value your staff

Everything depends on having enough time for the design and the right people. They are hard to find, but failing to invest in them is a waste. It is better to take a little longer over the preparations, and, most importantly, to value your staff.

The Pen, Patrick Groeneveld, Panel Building Account Manager at Unica

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectThe pen
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.