Mini air handling unit for Breedband office villa in Arnhem

More than 1,500 air handling units are produced every year at Systemair’s factory in Waalwijk. Each is fully tailored to the customer’s requirements, including heat recovery, heating, cooling and/or humidification, and in any required airflow rate, configuration and size. The company’s ability to go to great lengths was recently demonstrated at an office villa in Arnhem. Instead of the usual capacities of 10,000 to 30,000 m³/h, an HHFlex air handling unit with an airflow rate of 2,200 m³/h was installed here, measuring just 898 mm wide.
Breedband Arnhem’s office villa is located at the junction of Amsterdamseweg and Brantsenstraat and has around 500 m² of floor space across four storeys. Sustainability and energy efficiency were central to both the design and construction of the villa. The new building operates entirely without gas. While a thermal energy storage system with heat pumps provides heating and cooling for the various workspaces, the Systemair air handling unit ensures optimum air conditioning.

An HHFlex air handling unit with an airflow rate of 2,200 m³/h was installed in Breedband Arnhem’s office villa, measuring just 898 mm wide.
Many functions in a small footprint
Van den Berg Installateurs of Ede was responsible for the mechanical and electrical services in the office villa. On the recommendation of Brunsveld Veerbeek Ingenieurs, Systemair was awarded the contract for the design, supply and installation of the air handling unit. “An air change rate of just 2,200 m³/h was sufficient to provide all the rooms in the villa with enough fresh air,” says Account Manager Michel Molemans. “That sounds simple, but the air handling unit also had to incorporate the heating and control systems. It had to operate as a standalone unit and be controlled at constant pressure. To prevent overheating during the summer months, it needed to include provisions for night-time summer ventilation. A plate heat exchanger was also required to enable optimum heat recovery. The complete unit could be no wider than a metre, and its length was limited too. A bespoke solution was essential to meet these requirements.”
Space-saving technologies

More than 1,500 air handling units are produced every year at Systemair’s factory in Waalwijk.
This bespoke solution resulted in an HHFlex air handling unit measuring 898 mm wide, 1,400 mm high and 3,000 mm long, installed on the roof directly beside the stairwell. “Because space was limited, we made the fans in the unit as small as possible,” says Molemans. “We opted for energy-efficient EC centrifugal fans, leaving enough room to integrate the control systems. Thanks to a plate heat exchanger with an efficiency of 82%, we comfortably meet the ErP 2018 requirements.” In addition to the technologies and components mentioned, the air handling unit incorporates a fire-control function in accordance with the fire brigade’s requirements. Automatic temperature compensation prevents condensation.
A business enquiry for Systemair? Get in touch
Who worked on it
Breedband Arnhem in Arnhem
- luchtbehandelingsunit
Systemair - mechanical and electrical installationsVan den Berg Installateurs
- engineeringBrunsveld Veerbeek Ingenieurs
Keep following this
Get an email when a new story is published. No account needed.
- ProjectBreedband Arnhem
- ThemeHealthy indoor air
- SubjectHVAC
- CompanySystemair
- CompanyVan den Berg Installateurs
- CompanyBrunsveld Veerbeek Ingenieurs