Royal van Lent Shipyard, Amsterdam | Impressive air technology for Royal van Lent Shipyard

Construction of the new Royal van Lent Shipyard in Amsterdam’s western harbour area is nearing completion. The complex comprises two parts. One is a 15-metre-high low-rise building, which will serve as a workshop and paint shop. The other is a 35-metre-high production hall, where superyachts up to 160 metres long will soon be built. The hall will also be used for refits of existing yachts. Commissioned by BRI Groep, Vink Systemen BV is responsible for the design, manufacture, delivery and installation of the complete ventilation system for the project, covering the shipyard, workshop and offices.

The steel structure presented particular challenges in the production hall.
The new Royal van Lent Shipyard buildings are constructed entirely from steel. “The structure presented particular challenges in the production hall,” says Marc Oudt of Vink Systemen. “The entire ventilation system is integrated into the structural walls. To achieve this, we had to work in a construction sequence behind steel contractor De Kok Staalbouw and install our ducts at considerable height. The crane operator and our installers did an exceptional job.”
Early installation
Ductwork installation normally waits until a building is watertight and weatherproof, but that was not possible on this project, Oudt explains. “Our ducts were simply too large to pass through the steel structure. In addition, the installation of a dry dock significantly reduced our working space.” The solution was to install the ducts early. “We joined and insulated the ducts on the floor, then used a crane and two mobile elevating work platforms to guide them into position between the steel trusses. All the ducts were carefully wrapped in plastic to prevent damage during the subsequent construction work.”
Vink Systemen supplied and installed approximately 6,000 m² of rectangular ductwork and 3,000 linear metres of round galvanised ductwork on the project. The insulation comprised approximately 5,000 m² of thermal insulation and 300 m² of vapour-tight insulation. All ductwork meets Luka air leakage class C and cleanliness class L.
A landmark along the A5

“We joined and insulated the ducts on the floor, then used a crane and two mobile elevating work platforms to guide them into position between the steel trusses.”
The new Royal van Lent Shipyard is being built alongside the A5, Oudt explains. “At one point, passers-by could see the entire steel skeleton, including our ventilation installations. It made for a unique sight. The roofs, walls and façades were added later, finally concealing both our ductwork and the structure.”
The Amsterdam shipyard is not the first shipyard project undertaken by Vink Systemen. The Katwijk-based specialist in air ducts and ventilation components was also involved in building Oceanco’s yacht hall in Alblasserdam. “Our series of projects in shipbuilding halls is continuing with the Feadship project for Koninklijke De Vries Scheepsbouw in Aalsmeer.”
Question about this story? Ask your question
Who worked on it
Royal van Lent Shipyard in Amsterdam, new build
- ventilation systemVink Systemen BV
- steelwork contractorDe Kok Staalbouw
Keep following this
Get an email when a new story is published. No account needed.
- ProjectRoyal van Lent Shipyard
- ThemeHealthy indoor air
- SubjectHVAC
- CompanyVink Systemen BV
- CompanyDe Kok Staalbouw