One-stop shop for the complete ventilation system

Logistics service provider Neele-Vat is growing, prompting the construction of a new office campus and a new distribution centre in Pernis. The warehouse measures around 38,000 m2, with an office of approximately 7,000 m2 above it. The office has been rotated to face both the A15 and A4 motorways and the Eemhaven and Waalhaven ports. In addition, the roof of the hall can be used for multiple purposes, including greening, parking and solar panels. This supports Neele-Vat’s sustainability ambitions, which have also been carried through to the interior. The ventilation systems installed by the Schilt companies are a perfect fit.

As subcontractors to Installatiebedrijf Van Rennes, Schilt Luchtkanalen and Schilt Luchttechniek handled the production, supply and installation of approximately 3,000 m2 of rectangular ductwork and 2,000 m1 of round ductwork. “We opted for hot-dip galvanised steel ducts, which score very highly in terms of sustainability and energy efficiency,” says project manager Ben Stierman. “Both the rectangular and round ducts meet Luka Class C airtightness requirements. The main challenge was installing the ducts in the distribution hall, where they had to be fixed at a height of 14 metres.”

Neele-Vat’s sustainability ambitions have also been carried through to the interior. The ventilation systems installed by the Schilt companies are a perfect fit.

As a stockist for market leader TROX, the Schilt companies also handled the just-in-time delivery of all ventilation components, including damper sections, fire dampers, wall grilles, face grilles, volume control dampers, silencers and duct grilles. “We also installed the fan coil units in the warehouse office, as well as the Rodaflex Isophon III overflow flexible connectors in the warehouse,” says Stierman. “The flexible hoses, which also have sound-attenuating properties, ensure that all indoor air used can be extracted centrally, including air from enclosed spaces.” In the MER room, Schilt Airconditioning installed air-cooled split inverter units suitable for wall mounting. A Mitsubishi Electric VRF R2 system for cooling and heating was installed in the office and warehouse.

“Thanks to the Schilt companies, we have a single point of contact and one supplier for the complete ventilation system,” says Peter Jacobs, Projects Manager at Installatiebedrijf Van Rennes. “It is also very helpful that the Schilt engineers prepare the drawings themselves and take care of some of the project engineering. This takes a lot off our hands. We regularly work together on projects, and there is a good reason for that. The office and site teams work closely with us, and the ductwork installation is also of a very high standard.”    

A business enquiry for Schilt bedrijven? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectHVAC
  • CompanySchilt bedrijven
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.