Technical innovations at the new Koninklijke Van Eerd facility
Text Desiree PenningsImage Systemair

Bespoke air handling units
Koninklijke Van Eerd officially moved into its new production facility on 26 April: an energy-neutral, secure building that will now serve as its headquarters. The Tilburg-based manufacturer of folding carton packaging for the pharmaceutical industry chose three air handling units from Systemair, installed by Megens Installaties.
Megens Installaties carried out the plumbing, climate control, and building management systems for Koninklijke Van Eerd. The new 14,000 m2 facility is entirely gas-free, with air-to-water heat pumps providing heating and cooling. During the design-and-build phase, Megens Installaties’ engineers designed everything in BIM, after which the materials were delivered directly from the factory. Armand van Andel, Project Director: “Two HHFlex air handling units were installed in the production area, and one Geniox 14 unit in the office area. They provide heating, cooling and ventilation for the spaces. The unit in the office area has heat recovery via a rotary heat exchanger, which wasn’t needed in the production area, where a huge amount of heat is generated.”

Modular design
Systemair’s air handling units have a modular design, allowing them to be configured specifically for this project. This was done by consultant Klictet, which carried out preliminary studies and produced the final design. Van Andel: “The printing hall has presses that generate a huge amount of heat. Klictet specified the air volumes required and the air handling units’ specifications. We were already familiar with Systemair products, as we often work with them.”
Remote control
A Modbus connection was integrated into the central control system to bring together various building functions. This provided maximum flexibility for managing the installations remotely. The same applies to the air handling units, says Van Andel. “If the client wants the settings adjusted, we can do that remotely. We can easily control values such as supply air temperatures and the proportion of outdoor air. In the past, you had to get in your van and drive there. That’s no longer necessary.”

A lot of work in a short time
“We can certainly say that the project went smoothly,” Van Andel continues. “We worked under a design-and-build arrangement. The tender was issued on the basis of the final design. A number of parties were awarded the work, including an electrical contractor and the main contractor, who coordinated the project. Together, we developed a detailed construction design and designed the installations in relation to one another to execution level.”
The work took six months, which is a very short time given the size of the project. The heat generated by the printing presses meant that a complete cooling system had to be installed. “Getting so much work done together in such a short time requires good coordination and collaboration. Thanks in part to very thorough preparation, we succeeded. Everything was designed in BIM, so you can be confident that there will be minimal problems during construction,” says Van Andel.
A business enquiry for Systemair? Get in touch
Who worked on it
Koninklijke Van Eerd in Tilburg
- air handling units
Systemair - adviserKlictet
Keep following this
Get an email when a new story is published. No account needed.
- ProjectKoninklijke Van Eerd
- ThemeHealthy indoor air
- SubjectHVAC
- CompanySystemair
- CompanyKlictet