Future-proof Central Sterile Services Department for Diakonessenhuis Utrecht
Text Chris ElbersImage Hanab Installation Technology en Milan Hofmans

During the major refurbishment of the Central Sterile Services Department (CSSD) at Diakonessenhuis in Utrecht, Bouwcombinatie MedicomZes | Hanab Installation Technology created a sustainable, safe and future-proof healthcare environment. Working closely with the hospital, consultants and specialist subcontractors, the team delivered a department that brings together hygiene, logistics, technology and patient safety. The fully refurbished CSSD was handed over on Monday 8 June 2026, around two weeks ahead of the original schedule.
Diakonessenhuis is a general hospital with sites in Utrecht, Zeist and Doorn. At its Utrecht site, the CSSD plays a crucial role in infection prevention and instrument safety. Medical instruments are cleaned, disinfected, inspected, packaged and sterilised again here after use, ensuring that healthcare professionals have reliable, safe instruments available. The refurbished department supports this process with a logical workflow, clearly defined zones and installations designed to meet the stringent requirements of a controlled hospital environment.

Minimal disruption
Before reconstruction could begin, the existing CSSD was completely stripped out, including both the building fabric and the mechanical and electrical services. The strip-out, carried out by building contractor MedicomZes, marked the start of a complex project at the heart of a fully operational hospital. “The operating theatre complex is right next to the project area, meeting rooms are located below the department, and ambulances, suppliers, visitors and staff are constantly on the move nearby,” says project manager Luuk Lagendijk on behalf of lead partner Hanab Installation Technology. “That calls for close coordination, clear working arrangements and a delivery team experienced in working in a healthcare environment.” Measures including dust control, coordinated drilling and working hours, phased logistics, and evening, night and weekend working kept disruption to patients, staff and visitors to a minimum. Maintaining continuity of care remained the priority throughout.

Building services as a prerequisite
Within the construction consortium, Hanab Installation Technology was responsible for the electrical and mechanical services. Electrical works included central electrical infrastructure, power and lighting installations, communications systems and security systems such as access control, fire alarms and evacuation systems. Mechanical works included sanitary facilities and systems for demineralised water, process water and potable water. The central heating, chilled water, and measurement and control systems were also renewed and upgraded. In addition, an existing air handling unit was modernised and made more sustainable, and new air handling systems were installed to suit the department’s functional layout.
“In a CSSD, air quality is not just a matter of comfort, it is essential to hygiene and process safety. The system supports the separation of dirty, clean and sterile zones and helps control airflows, temperature, ventilation and pressure differentials,” says Lagendijk, noting that the building and building services disciplines had to be closely coordinated. “In a CSSD in particular, where process equipment and building services are directly linked to day-to-day healthcare logistics, this integrated coordination is key to the department’s overall quality.”

Continuity at the heart of the project
The successful handover was in part due to the close collaboration between Diakonessenhuis, the construction management team, Bouwcombinatie
MedicomZes | Hanab Installation Technology, consultants, suppliers and subcontractors. “Thanks to short communication lines, daily coordination and a shared focus on safety, quality and programme, issues were resolved in good time. The result is not only a technically high-quality department, but also a project that kept continuity of the hospital’s operations at its heart,” concludes Lagendijk.
Question about this story? Ask your question