Orato Offices is a sustainable, future-ready office building in Amsterdam. Client Zadelhoff is targeting BREEAM ‘Excellent’ certification for the new-build project, which covers approximately 12,500 m2. The aquifer thermal energy storage system is key to achieving this sustainability certification. It will provide heating and cooling not only for Orato Offices but also for the neighbouring building.
Drilling the thermal energy storage wells

The aquifer thermal energy storage system is supplied by a warm well and a cold well. Constructing these wells is a major undertaking involving a great deal of equipment. They are drilled to a depth of around 200 metres. Approximately 65 m3 of soil is pumped out of the ground and collected in settling tanks. As the sand-water mixture is brought to the surface, a sample is taken for every metre of depth to determine the composition of the soil. This establishes the depth at which groundwater can be extracted. The so-called ‘filter assembly’ is installed at these points. At Orato Offices, the choice was two single-well systems with heat pumps and a dry cooler. “Together, they have sufficient capacity to provide sustainable heating and cooling for the existing ‘De Henri’ office building and the new ‘Orato Offices’ at H.J.E. Wenckebachweg,” says David Hoogstad, project manager at Roodenburg.

BREEAM measures
Now that the aquifer thermal energy storage system has made energy generation more sustainable, the existing building will be taken completely off gas. The complex will then be all-electric. Solar panels, which will be installed on the roof of the existing building, make an equally important contribution to the BREEAM certification. With 200 solar panels, there will be no unused roof space left when the project is completed.
To meet BREEAM’s regulations and requirements, the building will also be fitted with control zones, LED lighting, energy metering and meeting rooms with a variable air volume system. CO2 meters that measure and adjust CO2 levels in rooms complete the BREEAM package.
BIM preparation
“We joined the project’s construction team at a very early stage,” says Hoogstad. “That gave us time to prepare the project carefully and coordinate it within the construction team. Our extensive experience in designing complex aquifer thermal energy storage systems in BIM, combined with our early involvement, resulted in a clash-free design. We are reaping the benefits during the construction phase. Most of the building services will also be installed as exposed services. We consulted with the architect on how to achieve this in a way that is both technically sound and aesthetically pleasing. The design is based on straight lines and right-angled branches.”
Roodenburg has subcontracted the sprinkler system to SPIE, which is installing it under its own responsibility. SPIE is using a sprinkler well rather than a water reservoir, as is also commonly done. This draws firefighting water directly from the groundwater. In this wet-pipe system, the pipes are always full of water.
Question about this story? Ask your question
Wie aan Orato Offices werkte
- clientZadelhoffIn this story
- aquifer thermal energy storage systemRoodenburgIn this story
- sprinkler systemSPIEIn this story
- insulationIsolatiebedrijf C.J. van Staveren B.V.Mentioned in ‘Orato Offices and De Henri are set to make significant savings on their energy bills’
Keep following this
Get an email when a new story is published. No account needed.
- ProjectOrato Offices
- ThemeGas-free heating and cooling
- SubjectBuilding services engineering
- CompanyZadelhoff
- CompanyRoodenburg
- CompanySPIE
- CompanySolar