Comprehensive package of building services for Borgstede residential care complex
Text Chris ElbersImage Van Dorp projecten

After successfully completing the first part in November 2023, Van Dorp projecten is now focusing on phase 2 of the Borgstede project in Barendrecht. Once handover is completed as planned in mid-July 2025, client Woonzorg Nederland will have a total of 99 brand-new apartments on Marjoleinlaan. Commissioned by Dura Vermeer, Van Dorp projecten is responsible for designing and installing all building services within the complex. This makes a significant contribution to Borgstede’s sustainable credentials, in a setting where residential and care facilities have been thoughtfully combined.
In phase 2 of the Borgstede project, which involves the construction of 49 homes, Van Dorp projecten is once again drawing on its extensive expertise from its Capelle aan den IJssel branch, both in mechanical services and beyond. Alongside a diverse package of mechanical installations, the company is also responsible for implementing the required measurement and control technology and connecting it to the building management system. Once again, this work is being handled by systems integrator HCRT. “We are also overseeing the installation of a substantial number of PV panels,” says assistant project manager Martijn Maase. “After supplying 54 panels during the construction of the first 50 apartments in phase 1, we have added a further 66 in phase 2. That brings the total to 120 solar panels supplying power to Borgstede, significantly reducing the complex’s electricity consumption.”

Plenty of challenges
As the primary heating, cooling and hot water services were installed in phase 1, Van Dorp’s work in phase 2 is somewhat less extensive. Even so, there are still plenty of challenges. “In consultation with the client, it was decided to deliver the bathrooms for the homes to site as fully prefabricated units,” says Maase. “Our task is then to expertly connect the bathroom’s hot water, ventilation and underfloor heating systems.”

Van Dorp is also bringing considerable expertise to the installation of air handling and ventilation systems for the homes and communal areas. “In phase 2, the air handling installation involves extending the central system for the communal areas and installing the system that will ventilate the homes,” says Maase. “We designed this specific ventilation system in line with the CERA concept. This means that the system, from the air handling unit to the ventilation grilles, has been calculated to minimise air resistance. This makes it possible to deliver an energy-efficient system and create a direct link between the air handling unit controls and the individual controls in the homes.”

Connections
To ensure a comfortable indoor climate in the building, which is due to be handed over shortly, the central heating/gkw system will be extended and connected to the connections prepared in phase 1. “These connections will supply the underfloor heating manifolds in the homes and communal areas,” Maase explains. “We are also building on the foundations laid in phase 1 in other areas. For example, we will tap into and connect to the system installed earlier to provide the hot water services.”
Question about this story? Ask your question
Wie aan Borgstede werkte
- clientWoonzorg NederlandMentioned in Barendrecht apartment complex is sustainable through and through
- main contractorDura VermeerMentioned in Barendrecht apartment complex is sustainable through and through
- architectAG NOVA ArchitectenMentioned in Barendrecht apartment complex is sustainable through and through
- Electrical workBarendrecht ElektrotechniekMentioned in Barendrecht apartment complex is sustainable through and through
- underfloor heating and coolingHolland VloerverwarmingMentioned in Underfloor heating brings comfort to Borgstede
- system integratorHCRTIn this story
- CERA-1 EPP ventilation unitBarcol-AirMentioned in Smart ventilation for the care homes of the future
Keep following this
Get an email when a new story is published. No account needed.
- ProjectBorgstede
- SubjectBuilding services engineering
- CompanyHCRT