Effective energy-saving measures

The Republica project is being equipped with an innovative, sustainable smart grid. The buildings on the site generate their own energy using aquifer thermal energy storage (ATES) systems and PV panels, alongside energy-saving measures such as a communal heat recovery system for shower water.
Challenging installation work

The installations at Republica are being carried out by Jonker bv, Van Dorp Installaties and Schoonderbeek. Jonker is responsible for the sanitary installations, Van Dorp for the mechanical services and Schoonderbeek for the electrical installations. The companies are modelling the project in BIM.
Delay followed by a rapid acceleration
Jonker is installing the dry fire mains, as well as the drainage, rainwater downpipes and cold and hot water systems, including the supply and installation of sanitaryware and the communal hot water systems. Preparatory work and engineering began in 2019. The project was delayed during the coronavirus pandemic when the intended hotel operator withdrew, but gathered pace after the new operator came on board.

Short-stay rooms
The new plans for the hotel rooms also meant changes to Jonker’s work. “The rooms have now been laid out differently,” says Hendri Otte, director and owner of Jonker. “The standard hotel rooms have been converted into short-stay rooms, equipped with a kitchenette and dishwasher. For us, this meant making the necessary changes to the design and coordinating more closely with the other building services.”
Heat recovery systems
The hotel’s heat recovery systems are a notable feature. They capture and recover waste heat from the shower water using a communal heat exchanger in the basement, before returning the heat to the boilers. This means considerably less energy is needed to raise the water to its final temperature.
Rainwater storage
The green retention roof is being fitted with an overflow and storage system. When it rains, as much water as possible is captured and stored on the green roof. Any excess is discharged slowly into the rainwater drainage system, preventing the municipal system from becoming overloaded.
Challenging installation work
“Republica is a substantial project for us. We have been working here for two years with a large team of installers. At the same time, it is a high-quality, high-profile commercial project. The communal hot water system, heat recovery and various pipework systems provide our installers with excellent, challenging installation work.”
A specialist
Jonker celebrates its centenary this year and has 40 employees working across the ‘greater’ Randstad, from Alkmaar to The Hague. Otte says: “We don’t try to do everything. We specialise in installing sanitary systems, such as communal water supply and drainage systems for residential buildings, care facilities and commercial buildings. This brings us high-profile projects in new-build, renovation and commercial construction.”
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeFuture-proof water and sanitary systems
- SubjectBuilding services engineering