Medisch Centrum Westerhage opened last September on the former ATEA site at Muizenberglaan 13 in Breda. The project combines existing and new buildings in an interesting way. The former two-storey building, which housed the social employment service and measures approximately 400 m2, was completely stripped out internally and given a new layout with care rooms. A connecting corridor links it to a new three-storey building of approximately 1,500 m2, which is occupied by various primary and secondary care providers. A key occupant is the GP practice on the 2nd floor. Medisch Centrum Westerhage also houses physiotherapists, a diagnostic centre, midwives, dietitians, psychologists, a wound care centre, osteopaths and a child health clinic, among others.
Complete, energy-efficient VRF system for Medisch Centrum Westerhage

The building design for Medisch Centrum Westerhage was drawn up by Ernst Architect. As part of a construction team with contractor De Kok Bouwgroep and building services consultant Rienks Engineering, installer Van Dijnsen Installatiewerken B.V. was responsible for the engineering and installation of all building services, from mechanical and electrical services to security systems. “The design took full account of the requirements of the Building Decree, occupational health and safety legislation, and the guidelines of the Landelijke Huisartsen Vereniging (LHV),” says Dennis Verwijmeren, Projectleider S&O at Van Dijnsen Installatiewerken B.V. “For example, privacy, sound insulation and hygiene are essential when building a medical centre. The building also had to operate 100% gas-free, which posed a significant challenge in the existing building. Individual room control was also specified for the climate control systems. This quickly led us to choose a 3-pipe VRF system, which makes smart use of the energy (heat) in the outside air and can heat and cool simultaneously.”
Four VRF systems
A total of four systems were installed for heating and cooling Medisch Centrum Westerhage: one for the existing section and one for each floor of the new building, says Verwijmeren. “Using the heat loss calculations, we determined the heating and cooling capacity required for each building section and completed the system design. We then requested quotations from three companies, and Centercon was awarded the contract to supply the complete VRF system.” Van Dijnsen Installatiewerken B.V. and Centercon regularly work together on projects, says Verwijmeren. “There are short lines of communication between our companies, quotation requests are dealt with promptly, and any unforeseen emergency is addressed straight away. That gives us confidence. The product quality is excellent, too.”
Efficient energy exchange
“Taking the project requirements into account, we proposed a ducted LG Multi V Heat Recovery system,” says Martin van der Voort, Accountmanager at Centercon. “This three-pipe system can cool and/or heat simultaneously, ensuring a comfortable indoor climate in every room and in every season.” Four air-to-air outdoor units are installed on the roof of Medisch Centrum Westerhage, he says. “From there, a main pipe route runs through the service riser to nine Heat Recovery boxes on the floors, which are in turn connected to 54 ducted indoor units. When one room needs cooling and another needs heating, the HR boxes ensure efficient energy exchange. No energy is lost to the outside. Choosing the LG Multi V Heat Recovery (HR) system means high COP and EER ratings. The system is also eligible for attractive subsidies such as the Energy Investment Allowance (EIA).”
Individually controllable
It was important that the VRF system could also serve as the primary heating system, stresses Van der Voort. “Individual control in each room was also specified, and our units are ideally suited to provide it.” Verwijmeren adds: “Each room has a local wall-mounted remote control, allowing users to set the desired room temperature. They can choose between cooling, heating, ventilation and dehumidification modes. The four VRF systems are also connected to a central LG control panel, which is linked to the fire alarm system. Any faults or emergencies can easily be diagnosed remotely, including by us, so the right action can be taken straight away.”
One-stop shop
Alongside the indoor and outdoor units, Centercon also supplied matching plenums, grilles, acoustically insulated hoses and other components, taking care of the installer’s needs. Van Dijnsen Installatiewerken B.V. began the installation work in December 2021, and the project was completed just over eight months later. This was made possible by the efforts of all the construction team partners, subcontractors and suppliers, and by their excellent collaboration. The result is a comfortable, functional medical centre.
A business enquiry for Centercon? Get in touch
Who worked on it
Medisch Centrum Westerhage in Breda
- complete VRF-systeem
Centercon - architectErnst Architect
- contractorDe Kok Bouwgroep
- building services consultantRienks Engineering
- installerVan Dijnsen Installatiewerken B.V.
Keep following this
Get an email when a new story is published. No account needed.
- ProjectMedisch Centrum Westerhage
- SubjectBuilding services engineering
- CompanyCentercon
- CompanyErnst Architect
- CompanyDe Kok Bouwgroep
- CompanyRienks Engineering
- CompanyVan Dijnsen Installatiewerken B.V.