Building services engineering

Living, working and learning in a safe, homely and healthy environment

Rik Eeftink, Projectleider bij Inno-Air BV op de technische zolder van één van de gebouwen.
Rik Eeftink, Projectleider bij Inno-Air BV op de technische zolder van één van de gebouwen.

​At the Valkenheide site in Maarsbergen, Pluryn is putting the finishing touches to a new treatment facility for highly specialised intensive youth care. The new building will replace the Lindenhorst JeugdzorgPlus site in Zeist and will also provide space for the small Athena girls’ group, which is currently housed in a temporary building on the site. Completion is scheduled for the end of June 2023. The new building will create a fully integrated specialist centre. Working alongside the existing open youth care facility and clinical centre will make it easier to step care up or down. It will also enable collaboration on additional treatments such as trauma therapy, creative and occupational therapy, and family therapy, as well as with the special education school, De Sprong.

Ventilation system ensures healthy indoor air in Pluryn residential buildings

At the Valkenheide site in Maarsbergen, Pluryn is putting the finishing touches to a new treatment facility for highly specialised intensive youth care.

The plans for the new building in Maarsbergen are based on the action plan ‘The most appropriate care for vulnerable young people’. The key principle is that young people receive help in a homely yet protected and safe environment. Five residential buildings are being constructed, where young people will have their own spacious studio with a shower and toilet. Each building will also have a shared living room. Commissioned by main contractor BINX Smartility, Inno-Air BV is installing the ventilation systems in all five residential buildings. From ductwork to fire dampers, valves and grilles, the systems are designed to ensure stable, comfortable and healthy indoor air quality.

Ventilation system layout

Each residential building will have its own air handling unit. “We are installing an extensive network of thermally galvanised air ducts to supply and extract air in the living areas,” says Rik Eeftink, Project Manager at Inno-Air BV. “We are fitting the ceilings in wet rooms, such as showers and toilets, with Systemair EFF-160-SW extract valves. The sleeping areas will also have round TFF-125-SW supply air valves. All fresh outdoor air will be drawn in and used indoor air extracted at the top of the plant room. A heat exchanger in the air handling unit will ensure efficient energy transfer, so that no heat is wasted.” Alongside the round EFF-160-SW and TFF-125-SW valves, Systemair is also supplying rectangular 400×200 mm NOVA-A aluminium external grilles for supply and extract air in the living rooms. Finally, various transfer grilles, including fire-resistant fusible grilles, will be supplied.

All fresh outdoor air will be drawn in and used indoor air extracted at the top of the plant room.

Passive fire protection

All valves and grilles are supplied by Systemair on a just-in-time basis. The same applies to the fire dampers. “The plant room floors have served as fire compartments from the outset,” says Eeftink. “During the engineering phase, the other masonry upper floors were also designated as fire compartments. Where our air ducts pass through these floors, we have installed Systemair F-R60-200-B230T and FDS-3G-400×200-B230T fire dampers.” The fire dampers provide passive fire protection, says Hans Honings, Account Manager, Industrial Department at Systemair. “When the ambient temperature reaches 72°C or smoke is detected, the fire dampers close automatically, triggered by the fire alarm system. This immediately interrupts airflow through the building and prevents toxic gases, smoke and fire from spreading to the floors above or below. As the air ducts get larger towards the air handling unit, we have supplied fire dampers in various diameters.”

All valves and grilles are supplied by Systemair on a just-in-time basis. The same applies to the fire dampers.

Inno-Air BV and Systemair regularly work together on projects. “Systemair was already specified in the tender documents for the new building in Maarsbergen,” says Eeftink. “But we are also pleased to work with this manufacturer and supplier on other projects. Systemair takes an active interest in projects and contributes its expertise, and queries are answered quickly. The products are also of excellent quality, which meant we were able to submit a competitive, high-quality quotation at short notice.” 

Een zakelijke vraag aan Systemair? Neem contact op

Wie eraan werkte

  1. ClientZorgkoepel Pluryn
  2. ArchitectAG NOVA Architecten
  3. Main contractorBINX Smartility
  4. Air ductsInno-Air BV
  5. Fire dampers and grillesSystemair

Blijf dit volgen

Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.

Wat je volgt
  • OnderwerpBuilding services engineering
  • BedrijfSystemair
Deel dit artikel

Volgen op Installatie & Bouw Nederland

Volg

Bij een project of bedrijf krijg je een e-mail zodra er een nieuw verhaal over verschijnt, bij een thema of onderwerp één keer per week een overzicht. Geen account en geen wachtwoord: in elke mail staat een link naar wat je volgt.