Building services engineering

New Minerva DC excels in sustainability

New Minerva DC excels in sustainability

Schiphol Trade Park in Hoofddorp aims to become Europe’s most sustainable and innovative business park. The new distribution centre developed by logistics property company WDP and co-developer Minerva Development is actively helping to achieve that ambition. The new DC, completed just before Christmas, is described by its creators as the ultimate example of the future of logistics. The building is not just designed for functionality, it also excels in sustainability, both visibly and behind the scenes.

Kromwijk Elektro was involved at an early stage to help shape the project’s electrical installations.

3D/BIM design

Main contractor Dijkham Bouw BV brought Kromwijk Elektro on board at an early stage to help shape the project’s electrical installations, from the distribution boards to the lighting, intruder alarm and data systems, access control and vertical solar panels. “We modelled the complete electrical design in 3D/BIM. We then combined and clash-detected all the architectural, structural and building services elements, resolving any issues to produce a design that could be built,” says Mark den Boer, project manager at Kromwijk Elektro. “Outside the building is a 2,500 Ampere transformer station. From here, we branch off with two busbar trunking systems: one supplying the warehouses and the other supplying the office units above. One challenge was the power shortage at Schiphol Trade Park. To address this, temporary gas turbines have been installed for the next five years, and we provided technical support for this.”

Solar façade

The distribution centre comprises 30,000 m2 of warehouse space, 3,000 m2 of office units and a 7,500 m2 car park beneath the DC, with 270 parking spaces. The building also has 28 loading docks and 4 ground-level overhead doors. To meet the BREEAM-NL ‘Excellent’ ambition, LED luminaires with motion sensors have been installed throughout. All major energy consumers are also sub-metered, says Den Boer. “We installed 226 vertical 370 Wp panels on the south façade, turning it into a solar façade. The panels are combined with a green façade and an automated irrigation and drainage system. Solar panels (2,000 Ampere) and plants are also planned for the roof, enhancing the building’s green appearance and benefiting biodiversity.”

Trusted partners

This is not the first DC that Kromwijk Elektro has delivered for Dijkham Bouw BV. The distribution centre for Ploeger Logistics in Harderwijk, for example, was recently completed. The two companies are currently working together on a new distribution centre at De President business park in Hoofddorp. And more projects are in the pipeline… 

Question about this story? Ask your question

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectBuilding services engineering
  • CompanySolar
Share this article

Advertisement

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.