Building services engineering

Prescor IC Fill: the smart inlet and filling combination

De Prescor IC Fill van Flamco is een slimme inlaat-vulcombinatie.
De Prescor IC Fill van Flamco is een slimme inlaat-vulcombinatie.

The Prescor IC Fill is an inlet and filling combination that protects the hot water storage appliance against excess pressure during the heating cycle. At the same time, the Prescor IC Fill is a practical way to top up and pressurise a central heating system in no time. Its clever, telescopically adjustable body with a stainless steel intermediate section makes the Prescor IC Fill a particularly smart solution!

Top up in no time

Without the Prescor IC Fill, topping up a central heating system is a cumbersome task that can involve as many as 9 steps. With the Prescor IC Fill, topping up is child's play. Open the shut-off valve on the central heating system and close it once the system is pressurised.

Adjustable body

The body of the Prescor IC Fill has an adjustable centre-to-centre distance. This means the inlet and filling combination can be used, without the need for an adapter, with all hot water production and storage appliances with a centre-to-centre distance of 65.0 to 71.6 mm between the cold water pipe and the central heating return pipe.

Reduced heat transfer

The telescopic section of the body is made of stainless steel, not brass. This material has a low thermal conductivity and conducts heat up to 8 times less effectively than brass. The Prescor IC Fill therefore reduces heat transfer between the central heating system and the cold water pipe. This is one of the reasons why the Prescor IC Fill is certified under the KIWA quality mark.

The Prescor IC Fill inlet and filling combination is suitable for use in all drinking water and hot water installations, wherever Waterwerkblad 4.4 B requires

an inlet combination (shut-off valve, EA check valve and relief valve) to be installed. The Prescor IC Fill has a maximum temperature of 95 °C and a maximum permitted operating pressure of 10 bar (set to 8 bar).

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectBuilding services engineering
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.