Building services engineering

Smart, fast plug-in installation

Smart, fast plug-in installation

By 2025, 75,000 homes will need to be built in the Netherlands every year. Meeting this market demand is no easy task. “The construction industry collapsed during the economic crisis,” says Steven Lemmens, Business Unit Manager Smart & Fast Installation at Hemmink. “Many professionals had to retrain or take early retirement, leaving the construction sector facing a significant shortage of skilled workers. Innovative plug-in solutions are essential to address this in the short term.”

With plug-in installation, cables and electrical (switching) equipment are delivered to the project ready for use. “Installers no longer have to assemble products, run cables and connect components themselves. They can start installing straight away,” says Lemmens. “Clear connector coding prevents connection errors and the costs associated with rework. Work can also be completed five to ten times faster. Plug-in installations require fewer skilled workers. And when labour time and costs are taken into account, plug-in installation is more cost-effective in most cases.”

Focus on preparation

Unlike conventional installation, plug-in installation relies above all on thorough preparation, Lemmens emphasises. “Cabling is no longer put together ad hoc on site, but prepared in advance in a controlled environment. Thorough preparation is essential, including determining, drawing up and checking the correct connection and loop-through points and cable lengths.”

Hemmink Smart & Fast Installation also supplies the corresponding fixing materials and tools. This enables us to meet our customers’ needs even more effectively.”

A personal approach

Hemmink supports installers with plug-in installation from start to finish. Lemmens says: “We visit installation companies every day to explain the benefits of plug-in installation. We also provide tailored training and work with our customers to identify projects suited to plug-in installation. Our specialists take care of the entire project design and draw up plug-in installation plans in the installer’s (BIM) model. We then explain these drawings in a face-to-face meeting. We also supply bills of materials, enabling installers to order their materials easily from the wholesaler of their choice.”

Smart & Fast Installation

In the Netherlands, Hemmink is the exclusive representative of Adels-Contact’s AC 166G plug-in system, which is proven to be interchangeable with the GST 18 system. The range includes connection and extension leads, plugs, and switching and distribution boxes. “We can also assemble, test and supply bespoke products,” says Lemmens. “Because we hold our own stock, we can supply flexible pack sizes. Hemmink Smart & Fast Installation also supplies the corresponding fixing materials and tools, enabling us to meet our customers’ needs even more effectively.”

Een zakelijke vraag aan Hemmink? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeBuilding electrical systems
  • SubjectBuilding services engineering
  • CompanyHemmink
Share this article

Advertisement

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.