Smart solutions for grid congestion

The days when energy consumption could be as high as you liked are over. Using less energy is something your business can be recognised for, by customers and the wider community alike. Energy management is playing an increasingly important role as specific climate targets have to be met and users are being held to account for their energy consumption. But the number of users continues to grow. As a result, another problem is becoming increasingly apparent: congestion on the energy grid.

In many parts of the Netherlands, grid capacity is not keeping pace with demand. This means that large commercial energy users may face restrictions on the amount of energy they can draw. For example, they may find that their new-build site has a maximum connection capacity of 3 x 80 A. Anyone who uses more can expect a fine. Repeated breaches could even result in disconnection. Dirk Blom, Utilities Sales Manager at Elektro Internationaal, regularly meets with various parties to find a suitable solution when grid capacity is limited. “As a manufacturer of switchgear and distribution boards, we are increasingly finding that creative solutions are needed to provide a project’s central power supply as part of its electrical installation.” He stresses that although limited energy availability from the grid often causes businesses initial headaches, there are fortunately still ways to provide the required energy supply by involving the right parties. “There is enough expertise in the market to find a solution. The right approach depends on the budget available and whether a short- or long-term alternative is being sought.”
Not everyone can dig under a motorway
There are extreme cases where people literally dig under a motorway to connect to the grid in another, less heavily loaded energy region. “But naturally, such an expensive solution is not an option for everyone,” says Blom. “That is why we work with the installer and end customer to develop a fully thought-through ‘own grid’, in which the various parts of the installation supply and consume energy at different times and according to carefully planned priorities, with gas turbines to generate power on site if required.”
Short term, long term or smart
Elektro Internationaal has recently helped deliver several projects with a range of different solutions. Blom says: “We designed and supplied a distribution board for a project where, for a period of 4 to 5 years, the grid connection capacity is supplemented by the output of a PV system and gas turbines that generate power on site. After that period, the turbines will have been written off and the grid operator says it will be able to supply more power again. This is therefore a temporary solution. But we have also completed a project where 500 A from the solar panels is used to make up for the grid shortfall. This is a long-term investment and also relies on feeding excess PV output back into the grid. We also have customers using a fully smart system that intelligently switches between the grid, the PV system and batteries. In these installations, it is precisely calculated when to charge and when power can be drawn.”
Working together on a bespoke solution
The main distribution board plays a significant role in this. Blom says: “The distribution boards engineered and manufactured by Elektro Internationaal are intelligent and equipped with all the necessary consumption meters to provide insight into energy flows, as well as switching systems to regulate consumption. Because all the elements of the installation need to be configured to work together, with connections made in the main distribution board, it is important to work out from the very beginning how best to achieve the customer’s objectives.” He reiterates the importance of bringing all the parties involved together in good time. “That is the only way to get businesses affected by grid congestion up and running with a well-planned, bespoke solution.”
Een zakelijke vraag aan Elektro Internationaal? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- SubjectBuilding services engineering
- CompanyElektro Internationaal



















