‘Towards an integrated design culture’

As building services become more extensive, design and construction are increasingly intertwined. IAA Architecten of Enschede (including Medisch Spectrum Twente) sees both challenges and opportunities in this development. “We work in an integrated way and see building services and the building as a single whole. When the technical design is integrated with the building design at an early stage, on the basis of a genuine understanding between the parties, it leads to better buildings,” say director Henk Gersen and engineering partner Jeroen Nijmeijer.
In their work, Gersen and Nijmeijer observe a ‘fragmented design process’, which means many opportunities are missed. Nijmeijer: “Even though the building services component is so important and is becoming increasingly extensive. Just think of the energy transition, which is changing the form building services take.” Gersen: “For IAA Architecten, a building is also a piece of engineering. In practice, however, we see that opportunities for innovation are not being taken often enough, particularly because an integrated design process is lacking. That is certainly not the case everywhere, but in our view it still happens too often.”

Medisch Spectrum Twente, Enschede.
‘Working together from the big picture down to the detail’
Is it down to clients, is it related to BIM, or does the procurement method determine the way a design is developed? “Of course, good client leadership matters, BIM is an important tool, and a project team, for example, is a good basis for integrated design,” Gersen continues. “But what matters most to us is genuine collaboration between architects, consultants and, ideally, contractors in the design process. You need to be able to design together, from the big picture down to the detail, rather than working in a fragmented way. The design process for Medisch Spectrum Twente, for example, was highly integrated, and that made a significant contribution to the final result.”
‘Blurred boundary’
That may be more common in large healthcare projects, given their scale, duration and risks, “but it works just as well in smaller projects, such as residential care centres,” says Nijmeijer. “The boundary between design and construction is becoming increasingly blurred, as is the distinction between electrical and mechanical services, particularly in all-electric projects. We sometimes contribute to programmes of requirements; in some cases, we work with contractors to develop the specifications. When you truly understand each other, great innovations can result. One example is the new Saxion Hogescholen building, where integrated floor systems provide greater building flexibility. We build for people, and that principle needs to carry through into the building services.”
Designing for the building’s lifespan
Design flexibility is essential to a building’s long-term value, say Gersen and Nijmeijer, making integrated collaboration equally indispensable. “You design for the building’s lifespan, and the amount of building services keeps increasing. So you need to build in flexibility. And not just in terms of building services. Flexibility of use is just as important to the building’s property value.” Architects and building services designers are all engineers, working on the same building, but often not at the same time. “Invest in each other and in the process from the outset, and the owner/user will get the best and most sustainable building for their investment.”