Connecting solar panels?
Text and images Elektro Internationaal

How to determine the capacity of the distribution board
Whether to save money as gas prices soar, enhance a sustainable image or become less dependent on an increasingly congested electricity grid, more and more households and businesses are choosing solar panels as an alternative energy source. At Elektro Internationaal, the number of customers wanting to connect solar panels to new and existing distribution boards is growing rapidly. This is also leading to more questions from the market about how to do so safely.
Dirk Blom, Utility Sales Manager at Elektro Internationaal, sees more and more installers acquiring the knowledge they need to do this responsibly. “But unfortunately, there are still companies that do not know enough about what is required to connect PV to an existing distribution board,” he says. “End customers should be able to rely completely on the advice they receive. One thing we do encounter is customers wanting to cover their entire roof with solar panels. The common assumption is often: ‘I have a 63A connection, I use 63A and my distribution board’s busbar system is designed for that. So I’ll put 63A of PV on the roof, connect it to the distribution board and off we go.’ Scope 12, the fire-risk inspection for solar panels, puts a stop to that. It stipulates that the 63A you use must be added to the 63A from the solar panels you are connecting. In that case, your distribution board must therefore be rated for 125A. A misconception we still sometimes encounter is that the main switch must also be uprated. But that is, of course, nonsense. The grid connection does not change. You are simply adding another energy source.”
Adding currents together
“In a domestic consumer unit, it certainly makes sense to add the currents together,” says Blom. “But in larger installations, it is particularly useful to know where in the distribution board the PV is connected, because that determines exactly where the currents will flow. As an example, we sometimes use a hose connected to a rainwater downpipe. Suppose you connect another hose to it. The downpipe can only handle a certain amount of water. But if you connect it cleverly, all the water can still drain away. We design large installations around that principle. Otherwise, distribution boards would be manufactured with an excessively high power rating or oversized, more expensive components, even though they are not needed in practice.”

Determining the capacity
The required rating or capacity of a distribution board when connecting solar panels depends on several factors. The following steps can be used to determine it:
1. Determine energy consumption. Start by establishing the installation’s total energy consumption. This could be a home, commercial building, industrial process, and so on. You need this information to determine how much energy the solar panels must generate to meet this demand.
2. Calculate the total generation capacity based on power density. Solar panels have a certain power density, expressed in watts per square metre (W/m²). This indicates how much power a solar panel can generate per unit of area. Multiply the power density by the available roof area to obtain a rough estimate of the total generation capacity.
3. Calculate the required capacity. Use total energy consumption (step 1) and the estimated annual generation from the solar panels (step 2) to determine the required capacity of the solar panels. This can be expressed in kilowatts (kW) or megawatts (MW), depending on the scale of the installation.
4. Add a safety margin. It is advisable to add a safety margin to the required capacity to allow for variations in solar irradiance, panel efficiency, panel ageing and other factors. A typical safety margin is between 10% and 20%.
5. Another important factor when determining the required capacity of a distribution installation with connected solar panels is simultaneity. André de Widt, Service Manager at Elektro Internationaal: “Simultaneity refers to the fact that not all loads in a building or facility operate at their maximum level at the same time. This means that certain loads can be combined to achieve a lower peak load.”
We calculate the safety margin and capacity of the distribution installation, taking simultaneity into account, based on the following points:
a) The simultaneity factor. Analyse the loads used in the building or facility and determine how many of them are likely to operate at their maximum level at the same time. This is known as the simultaneity factor and is often expressed as a percentage. For example, if you have established that 70% of the total loads are likely to operate at their maximum level, the simultaneity factor is 0.70.
b) The total load. Multiply the building’s total energy consumption by the simultaneity factor to calculate the total load expected on the electricity grid at the same time.
c) A safety margin. Add a safety margin to the total load to account for uncertainty and variability. This can be similar to the 10% to 20% mentioned above.
6. Required capacity. Consider the total load, including the safety margin, and the solar panels’ expected maximum generation capacity. This gives you an idea of the distribution installation’s required capacity to meet simultaneous demand and accommodate the solar panels’ surplus energy.
7. The right components. Based on the calculated required capacity, you can select suitable electrical components, such as fuses, switchgear, cabling and transformers, to ensure the installation operates safely and efficiently.
“Including the simultaneity factor in your calculations is crucial because it can result in significant savings on installation costs,” says De Widt. “It enables you to design an installation that is not oversized, helping you avoid unnecessary costs and material waste.”
Penny wise, pound foolish
“However,” De Widt warns, “customers should be careful not to undersize their calculations in a misguided attempt to save money. With the energy transition in full swing, grid capacity constraints and new energy sources emerging all the time, it is wise to think big when purchasing a distribution board. If the number of end users on the installation increases at some point in the future, the amount of electricity required, or consumption, will also rise. As grid congestion makes it increasingly difficult to feed electricity back into the grid, more and more customers are switching to batteries for storage or adding a cooling or heat pump. This increases demand to the point where the installation’s busbar system will eventually no longer be sufficient. And then
a new distribution board will have to be purchased. So, if you are thinking ahead, it is better to have a slightly higher-rated board installed to accommodate possible extensions. In any case, it is advisable to have a detailed calculation carried out by a specialist and seek advice on what is and is not technically required in light of your specific circumstances and needs, now and in the future.”
A business question for Elektro Internationaal? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- SubjectElectrical engineering
- CompanyElektro Internationaal
- CompanySolar