Electrical engineering

‘Install a complete floor in just a few days’

Text Lieke BousemaImage Isolectra

De nieuwe kantoorgebouwen tellen ieder vijf verdiepingen en worden met loopbruggen verbonden, waardoor één indrukwekkend en geschakeld kantoorcomplex met 4.000 werkplekken ontstaat.
De nieuwe kantoorgebouwen tellen ieder vijf verdiepingen en worden met loopbruggen verbonden, waardoor één indrukwekkend en geschakeld kantoorcomplex met 4.000 werkplekken ontstaat.

Plug-in, fast and efficient

Four new office buildings, a central plaza, two ancillary buildings and the renovation of an existing car park: a large business campus at De Run 1000 in Veldhoven is being expanded in line with the BREEAM ‘Excellent’ sustainability rating and WELL Gold health and wellbeing rating. Mansveld Techniek was brought in by the client at an early stage to deliver the extensive project as part of a construction team with Hurks and Croonwolter&dros. The Eindhoven-based technical specialist is responsible for all electrical installations, from security systems and data installations to lighting and power installations, for which plug-in technology from Isolectra was among the solutions selected.

The main components are Wieland distribution boxes, combined with a large number of bespoke connection leads.

The new office buildings each have five floors. They are linked by walkways, creating one impressive, interconnected office complex with 4,000 workstations. Mansveld Techniek is providing the advanced electrical systems. “For safety and security, we are responsible for the fire alarm and evacuation system, CCTV, magnetic contacts and other security systems,” says Rene van den Biggelaar, Technical Project Leader at Mansveld Techniek. “We are also installing data systems in ceilings, floors and walls, all the lighting and the earthing system. In addition, we are responsible for the power installations. A large busbar runs from the transformer to the main distribution boards and all the sub-distribution boards. We are also installing all the cable routes and providing the cabling for the Ericsson and Vodafone antenna system. Last but not least, a Signify smart grid is being installed to control the building services systems as well. In short, this project draws on all our areas of expertise.”

Power supplied via the floor trunking

All new office floors will be fitted with floor trunking, with power supplies for the 4,000 workstations connected on a plug-and-play basis. “Since the floor trunking is permanently closed after just a few days of installation work, Mansveld Techniek was looking for a fast, error-free installation method,” says Jordi Blanker, Account Manager, Building Installation Technologies at Isolectra. “Our plug-in installation system is ideally suited to this. We worked with Mansveld Techniek to develop an effective installation plan, and Isolectra provided the drawings. Wholesaler Technische Unie is handling just-in-time deliveries, while Mansveld Techniek carries out the installation and oversees the work.”

Jordi Blanker, Account Manager, Building Installation Technologies at Isolectra (left), and Erik van Zanten, Installation Supervisor at Mansveld Elektrotechniek (right).

A successful three-way partnership

“What makes this project special is the successful three-way partnership we have established between the supplier, client and wholesaler,” Blanker emphasises. “Together, we came up with an excellent and efficient plan for the plug-in technology.” He says the plan was based on a number of specific wishes and requirements. “The client specified that we use systems of the highest quality. In addition, the main distribution boards had to be waterproof, so we developed waterproof connections for our plug-in system. Using the installation plan as a guide, we labelled all the plug-in materials with specific identifiers. This means Mansveld Techniek’s installers can see exactly which materials need to be connected where. We also developed an installation kit for each office wing, with all the materials for one wing smartly grouped together.” Van den Biggelaar adds: “Thanks to the plug-in technology, two Mansveld Techniek installers can fit an entire floor in just a few days.”

A Wieland GST18® connector is fitted at one end, while a Wieland RST20® connector at the other ensures a waterproof connection.

Wieland GST18® and RST20®

The Wieland GST18® system combined with Wieland RST20® was selected to supply power to the workstations. This is a circular choice, as both systems were recently included in the National Environmental Database with a Category 1 environmental declaration. “The main components are our Wieland distribution boxes, combined with a large number of bespoke connection leads,” says Blanker. “A Wieland GST18® connector is fitted at one end, while a Wieland RST20® connector at the other ensures a waterproof connection.” The office buildings will be handed over in phases from week 6 of 2024. The new buildings are due to be fully completed in the fourth quarter of 2024.  

Have a business enquiry for Isolectra BV? Get in touch

Who worked on it

De Run 1000 in Veldhoven

  1. pluggable systemsIsolectra
  2. electrical installationsMansveld Techniek
  3. wholesaleTechnische Unie
  4. smart gridSignify
  5. distributieboxenWieland

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectDe Run 1000
  • ThemeBuilding electrical systems
  • SubjectElectrical engineering
  • CompanyIsolectra BV
  • CompanyMansveld Techniek
  • CompanyTechnische Unie
  • CompanySignify
  • CompanyWieland
Share this article

Advertisement

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.