639 heat recovery ventilation units and extensive ductwork for The Cube residential tower

The design and construction of student accommodation complex The Cube in Utrecht Overvecht placed a strong emphasis on creating a healthy and comfortable indoor environment. The ventilation system plays an essential role in this. A total of 639 heat recovery ventilation units were installed to ventilate the apartments, connected to 3,000 m¹ of round ductwork and 4,438 m2 of rectangular ductwork.
As regular subcontractors to Linthorst Techniek, Schilt Luchtkanalen and Schilt Luchttechniek produced, supplied and installed a complete, sustainable ductwork system, including associated air-handling components from market leader TROX, such as fire dampers, pressure relief dampers, controllers and grilles. The Schilt companies, based in Meerkerk, also installed the heat recovery ventilation units. “Each unit has four connections, for which we installed around 3,000 m¹ of acoustically insulated flexible ventilation hoses,” says project manager Rini Couwenberg. “This means that noise from the units is not an issue. We also installed 1,330 non-return dampers on the branches to ensure that airflow can only travel in one direction, even when the mechanical ventilation stops. This prevents reverse airflow and nuisance draughts.”
Seamless transition from engineering to installation
According to Ronald Ruisch, project manager at Linthorst Techniek, choosing the Schilt companies for this project was an obvious decision. “We have worked together on several projects in recent years, so communication is straightforward. The transition from engineering to installation is seamless, too. We are both familiar with BIM. The designs we provide are quickly and efficiently translated by the Schilt companies into production and installation drawings. They can also incorporate all the air terminals in one go, minimising the risk of errors and delays. Another welcome innovation at The Cube is the use of thermally insulated ductwork.”

Thermally insulated ductwork
Towards the roof caps, the Schilt companies installed around 200 m2 of galvanised steel ductwork. “For the intake and exhaust ducts, we chose the innovative, thermally insulated R-vent SPEED indoor ductwork,” says Couwenberg. “In total, this amounts to more than 4,200 m2 of ductwork. A major advantage of R-vent SPEED ducts is that they are already insulated and treated internally, significantly shortening the lead time for this project. They are also very lightweight. A 200 μm aluminium cladding provides excellent protection against outdoor air.” The R-vent SPEED ducts were installed across 15 floors and fitted into more than 50 risers.
Large quantities, short lead time
One major challenge was the large quantity of ductwork that had to be installed in a relatively short time, says Couwenberg. “To keep the construction programme on track, it was agreed after careful consultation that the ducts would be installed only after the floor finishes were complete. This helped the project run more smoothly.” To prevent the lightweight ducts from being blown away, the Schilt companies chose not to store any materials on site, instead delivering them just in time and taking them straight to the correct floors. “Metal wall brackets were chosen for the supports. It was essential that there were no changes in duct level. Any drops in height had to be avoided at all times, and, working closely with our installation partners, we succeeded.”
A business enquiry for Schilt bedrijven? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeHealthy indoor air
- SubjectProjects
- CompanySchilt bedrijven