Everyone is entitled to a healthy, comfortable, safe and optimally accessible built environment, now and in the future. Strukton Worksphere has been successfully working towards this for more than 95 years. “As an organisation, we deliver a complete package,” says Group Leader Engineering and BIM Coordinator Michiel Klep. “From design and engineering through to construction, management and maintenance. And across building services, electrical and mechanical engineering. We are increasingly working in 3D/BIM, not only on large construction projects but also on regional commissions.”

“BIM ensures optimal control,” says Klep. “Projects are prepared in greater detail, resulting in more efficient execution, fewer clashes and lower costs arising from errors. Maintenance and management can be carried out more quickly, efficiently and cost-effectively. What is more, clients, contractors and building managers gain a better understanding of the building. Investing in BIM is therefore an investment in the future.”

Strukton Work­sphere uses Stabicad for Revit as its BIM software package. According to Klep, this is no surprise. “We had been working with Stabicad for AutoCAD for many years, so we decided to implement Stabicad for Revit as well. The two software packages have a lot in common, which significantly lowers the barrier to switching. Stabiplan also supplies various (Trimble) hardware solutions, enabling us to transfer our software to the construction site optimally.”

With the addition of Trimble’s Robotic Total Station, the positions and dimensions of various building elements and installations can be accurately marked on the project using a laser.

3D model as a basis

Klep stresses that agreeing on clear arrangements is essential to making the most of a BIM project. “Before each (BIM) project, we discuss with the architect and all the other contractors how the (BIM) information will be processed and shared. We place maximum emphasis on digitising processes. Around 80-90 per cent of our projects involve building renovations. To map these buildings as accurately as possible, we are increasingly using 3D laser scans. A Trimble laser scanner, purchased through Stabiplan, is placed inside the building and captures a 360° scan of each room or grid section, recording a large number of measurement points every second. Together, these scans form not only a 3D model of the existing building, but also the basis for our new building design. We literally bring the construction site back to the office.”

Point cloud: a collection of measurement points captured by the 3D laser scanner, providing an accurate picture of the existing building.

Optimal transfer to the construction site

The building design is optimised to meet the client’s requirements and applicable (quality) standards. “This makes it easy to identify and indicate which existing elements need to be demolished or dismantled, as well as where there is enough room to install, for example, new pipework routes or air ducts,” says Klep. “Once the client and our project team have approved the design, it is ‘taken’ from the computer back to the construction site, where our fitters carry out all the work.”

Until recently, the fitters worked from flat (2D) working drawings. “A waste,” says Klep, “because valuable design and building information is lost as a result. Over the past few months, we have therefore been looking for ways to transfer digital information to the construction site as effectively as possible. A number of site supervisors have been given a rugged tablet on which they can view the 3D model. But the best solution is the addition of Trimble’s Robotic Total Station, also purchased through Stabiplan, which uses a laser to mark the positions and dimensions of various building elements and installations accurately on the project. This will soon make marking out by hand a thing of the past, resulting in even faster and more efficient installation, with fewer errors.”

Recent BIM projects by Strukton Worksphere include the new premises for the National Institute for Public Health and the Environment (RIVM) and the Medicines Evaluation Board (CBG) in Utrecht, as well as several major projects at Schiphol. A regional BIM project is the new operating theatre complex for Máxima Medisch Centrum in Veldhoven.  

Question about this story? Ask your question

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeIntegrated construction and building services
  • SubjectProjects
  • CompanyTrimble
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.