Two new, slender residential towers stand on the former site of the GAK office and in the heart of the Paddepoel district: Atlas and House of Groningen (Pleione). Both towers have been built without a gas connection and feature the latest sustainable technologies. Heating and domestic hot water are supplied via a connection to the WarmteStad network. Commissioned by Plegt-Vos Bouwgroep, Aalbers Installatietechniek is delivering all the mechanical and electrical services. Building Atlas has now been completed; Pleione is due to follow at the end of January.

The homes in building Atlas are equipped with a heat interface unit, which supplies heat and domestic hot water. “Radiators were chosen to heat the 224 semi-independent residential units. They were fitted into the prefabricated timber-frame elements at Plegt-Vos Bouwgroep’s workshop,” says Project Manager Jeroen Jonge Poerink. “This kept the number of transport movements on site to a minimum.” The 131 social-rent homes and 28 private-sector homes in Pleione are heated by underfloor heating. Heat recovery ventilation units provide ventilation for all the homes. Aalbers Installatietechniek also installed the complete electrical systems in the residential towers, from switches and sockets in the homes to lighting and power cables in the circulation areas. The contractor also installed dry fire mains in both towers.

During the preparatory phase, Aalbers Installatietechniek modelled all the building services in BIM.

During the preparatory phase, Aalbers Installatietechniek modelled all the building services in BIM. “We worked with the main contractor and structural engineer in a single model and carried out regular clash checks. The result was a manageable construction process, with minimal rework costs and snagging items,” Jonge Poerink emphasises. “During the construction of Atlas and Pleione, we had to submit only ten drilling requests, for example to create additional openings. Five of these requests were prompted by the client’s evolving requirements. That is a unique achievement for the construction of two large residential towers.”

Cameras mounted on the tower cranes carefully documented all the installation work. “We collected all the as-built photographs, overlaid them on the installation model and compared them carefully,” says Jonge Poerink. “This was a unique quality check, which demonstrated that all the installations had been fitted in accordance with the design.”

Question about this story? Ask your question

Wie aan Atlas werkte

  1. installerAalbers InstallatietechniekIn this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectAtlas
  • SubjectProjects
  • CompanyAalbers Installatietechniek
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.