AWL-Techniek B.V. | Energy-neutral new build for high-tech machine manufacturer

AWL-Techniek B.V. | Energy-neutral new build for high-tech machine manufacturer

AWL-Techniek B.V., a systems integrator of automated high-tech machines based in Harderwijk, decided in 2017 that it was time for a new head office. Construction of the 14,000 m² factory was completed in October 2019, and the 8,500 m² office building has recently been handed over. The result is a building that is optimally tailored to the activities of the Veluwe-based machine manufacturer, both now and in the future. Leertouwer, based in Barneveld, provided all the electrical, security and ICT installations as a construction team partner and consultant.

Intensive collaboration within the construction team has delivered a gem of a building on Keplerstraat in Harderwijk. Henri Siemelink, Leertouwer’s Project Manager, Commercial Buildings, who was closely involved in the challenging project, is immensely proud of the result. This achievement is due not only to the contribution of a wide range of expertise, but also to the strong collaboration between all the parties involved. “When you are involved in a project from the outset as a construction team partner, you are better placed to identify the client’s wishes and requirements and then translate them efficiently into the proposed solution. This building is yet another example of that.”

foto 3 leertouwer kopieren

The central staircase in the office building.

Optimal integration

AWL’s new head office works like clockwork. In every respect. The building is officially classified as energy-neutral and is heated and cooled using an aquifer thermal energy storage system with heat pumps. This also enabled the building to be delivered entirely without gas. Around 3,500 solar panels have been installed on the roof, with a combined peak capacity of 1.15 megawatts. Van der Poel Architecten, Dijkham bouw, Alferink van Schieveen, Hollander Techniek (responsible for the mechanical installations), Studio Wederzijds, EeStairs, Intermontage and Leertouwer have delivered excellent work together. In line with its corporate mission, ‘Sustainable connections’, Leertouwer naturally focused on optimally integrating the electrical, security and ICT installations. “As far as the electrical work is concerned, we installed the LED lighting and all the workstation connections,” Siemelink explains, listing the highlights. “For security, we installed systems for intruder detection, evacuation, fire alarm, access control, emergency lighting and CCTV. By installing patch cabinets and a main equipment room (MER), we laid a solid foundation for the ICT infrastructure. Leertouwer also installed the raised access floor in the office building, the bandraster luminaires, the flat-ribbon cabling system and a busbar system with tap-off boxes. We also acted as project coordinator, resolving all the architectural, mechanical and electrical clashes. Last but not least, we coordinated with AWL itself, the interior architect and various suppliers.”

foto 1 leertouwer kopieren

Some of the 3,500 PV panels in total.

Comfort

This list illustrates Leertouwer’s versatility and approach. The company has been successfully serving the residential, commercial, healthcare and industrial sectors for over 90 years. “We approach every project from the client’s perspective and do everything we can to improve their comfort with a functional, smart and future-proof installation,” says Siemelink. “Our more than 170 specialists work towards this every day.”      

Question about this story? Ask your question

Wie aan Hoofdkantoor AWL-Techniek Harderwijk werkte

  1. clientAWL-Techniek B.V.In this story
  2. construction team partnerLeertouwerIn this story
  3. architectVan der Poel ArchitectenIn this story
  4. Mechanical installationsHollander TechniekIn this story
  5. architectVan de Poel ArchitectenMentioned in Custom control solutions for the new AWL-Techniek B.V. facility in Harderwijk
  6. construction workDijkham bouwMentioned in Custom control solutions for the new AWL-Techniek B.V. facility in Harderwijk
  7. regelaarsPrivaMentioned in Custom control solutions for the new AWL-Techniek B.V. facility in Harderwijk

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectAWL-Techniek headquarters Harderwijk
  • SubjectProjects
  • CompanyAWL-Techniek B.V.
  • CompanyLeertouwer
  • CompanyVan der Poel Architecten
  • CompanyHollander Techniek
Share this article

Advertisement

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.