Installation as a logistical challenge.

All the homes in De Zalmhaven will be fitted with underfloor heating and cooling, designed and installed by COMAP. The company has also developed a special manifold for the project, helping to ensure residents enjoy a comfortable indoor climate.

Once the homes are complete, COMAP will also install underfloor cooling in the restaurant on the top floor.

Giesbers InstallatieGroep asked COMAP to help develop a smart, straightforward installation method. The installer was looking for a partner that could take the pressure off. Thanks to their longstanding collaboration, the company knew it could rely on COMAP. Together, they developed a system suited to the homes that could be installed quickly. “We could have used standard materials, but we wanted to make things easier for the installers,” says Geert Ververs, RHC Director at COMAP. “The district heating manifold and the heat emitter sets are prefabricated, which has saved us a considerable amount of labour time. The manifold connects to the heat emitter sets with two straight pipes. The control system for heating and cooling has been completely customised.”

Maximum efficiency

The construction of De Zalmhaven is characterised by its rapid pace and the limited space on site. This makes logistics one of the biggest challenges, says Ververs. “The installation is one thing, but the logistical side may well be the most important part of this project. We have people handling deliveries outside normal working hours. Construction site permits specify what time you need to be there. Once your permit has expired, you can no longer enter the site. That makes sense, as this is a city-centre construction site in Rotterdam. Parking and deliveries have to be managed very carefully.”

The different parties coordinate regularly, helping the project progress quickly and achieve a high standard of quality.


Materials are allocated to each floor every day. Materials are moved around by so-called runners from BAM Bouw en Techniek, who work at night. The work is carried out with maximum efficiency. According to Ververs, this is not just a challenge, it also makes the work more enjoyable. “You can see now how important the preparation phase is.  

You can’t simply send an installer back downstairs if they have forgotten something, as that can easily cost you an hour. The project is enormous in scale. It involves three towers, and therefore three construction workflows that all need to be supplied with materials and workers. Keeping to the tight schedule is demanding, but it’s also great to experience.”

Digital administration system

The installation of the underfloor climate system is also closely monitored digitally by main contractor BAM Bouw en Techniek. Technical drawings are released for each home and are each provided with the client’s digital signature. Ververs says: “This digital administration system records everything relating to drawings, reports and timesheets. It does take us extra time to manage it properly. The client’s quality requirements are very high.”


Ververs says the great thing about this system is how transparent it is. All the work is visible, and it is immediately clear whether something has gone right or wrong. “After installation, we take a photo and send it in. We then receive a notification confirming whether the materials have been installed correctly. If something has gone wrong, we send another photo after fixing it, and the matter is dealt with immediately. Once you get used to working this way, it’s ideal. We can also look everything up ourselves and see how things are progressing.”

Trusting each other

BAM Bouw en Techniek, Giesbers InstallatieGroep and COMAP are working closely together on this project. Their innovative and efficient approach has made the collaboration highly successful. The different parties coordinate regularly, helping the project progress quickly and achieve a high standard of quality. “I’ve rarely worked on a project where people respond as quickly as they do here. It’s ideal,” says Ververs. “Giesbers handles most of the logistics for us. We supply the materials, and they sort them. When our installers arrive on site, the manifold, fixings and everything else they need are ready on the relevant floor. We’ve been working with Giesbers for years, so both sides know they can rely on each other.”    

All the materials required are distributed across the floors according to a tight schedule.

A new way of working

De Zalmhaven is an important project for COMAP. Not only is it an impressive reference project, it also represents a new way of working. Quality and innovation are top priorities. The client’s satisfaction with the approach is clear from the fact that COMAP has also been awarded the contract to install underfloor cooling in the highest restaurant in the Netherlands. Work is due to start in mid-August. De Zalmhaven is expected to be completed in April 2022.   

Question about this story? Ask your question

Wie aan De Zalmhaven werkte

  1. KabeldraagsystemenOBO BettermannMentioned in A prestigious project for all contractors: pioneering living at De Zalmhaven
  2. VentilatiesysteemSTEBOMAMentioned in A prestigious project for all contractors: pioneering living at De Zalmhaven
  3. electrical installationBectro InstallatietechniekMentioned in A prestigious project for all contractors: pioneering living at De Zalmhaven
  4. clientZalmhaven CVMentioned in A prestigious project for all contractors: pioneering living at De Zalmhaven
  5. architectDam & PartnersMentioned in A prestigious project for all contractors: pioneering living at De Zalmhaven
  6. architectKAAN ArchitectenMentioned in A prestigious project for all contractors: pioneering living at De Zalmhaven
  7. Vloerverwarming en -koelingComap NederlandMentioned in A prestigious project for all contractors: pioneering living at De Zalmhaven
  8. BrandpompsetsWB FirepacksMentioned in A prestigious project for all contractors: pioneering living at De Zalmhaven
  9. underfloor heating and coolingCOMAPIn this story
  10. installerGiesbers InstallatieGroepIn this story
  11. main contractorBAM Bouw en TechniekIn this story
  12. ComfoAir Q WTW-unitsZehnderMentioned in High-quality ventilation systems for DE Zalmhaven

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectDe Zalmhaven
  • ThemeGas-free heating and cooling
  • SubjectProjects
  • CompanyCOMAP
  • CompanyGiesbers InstallatieGroep
  • CompanyBAM Bouw en Techniek
Share this article

Advertisement

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.