Change= residential complex in Utrecht Leidsche Rijn: VAV system delivers optimum energy efficiency, health and comfort

A residential complex with 600 affordable studio apartments for young working people is being built in four phases next to the Pathé cinema and on Berlijnplein in Utrecht Leidsche Rijn. The ground floor of the building will also provide space for artists’ live-work studios, a gym, a restaurant and additional facilities focused on work, living, learning, care & wellbeing, mobility and safety. The residential complex is being built for social concept developer Change= by BAM Wonen, Speciale Projecten. Its innovation ambitions are high: the aim is to create one of the smartest and most sustainable residential complexes in the Netherlands. STEBOMA’s ventilation systems are making a significant contribution to this.
STEBOMA is a regular supply chain partner of BAM Wonen: Speciale Projecten. “Three years ago, we built the Change= residential complex at the junction of Bijlmerdreef and Dolingadreef in Amsterdam-Zuidoost together,” says project manager Pieter Keesom. “The positive experience of that project prompted Change= to work with BAM again.” STEBOMA’s Beverwijk branch was also brought on board once more. “We designed and submitted a proposal for the ventilation system. Initially, we planned to install a 2-zone heat recovery ventilation system with CO2 control in the residential complex, but after further optimisation we settled on a central system with VAV units linked to a CO2 control system in each dwelling.”


Ventilation in the studio apartments
The starting point for the ventilation system in the studio apartments was the 2012 Building Decree, says Keesom. “This includes a ventilation rate of 3.24 m3/m2/h in the living rooms.” Change= also asked whether the system could meet its GPR target. “One condition for achieving a better GPR score was to increase the ventilation rate by a factor of 1.5. The ventilation rates have therefore been increased to 115 m3/h for kitchens and 75 m3/h for bathrooms. To achieve this as effectively as possible, each studio apartment is connected to a central mechanical extract system. Every apartment has an electronically adjustable VAV damper linked to a CO2 sensor in the room. When the CO2 level rises above a certain value, the VAV damper opens automatically. This allows ventilation at a higher rate until the CO2 level returns to the desired level. When nobody is in the room, the VAV damper remains at its minimum setting. This project shows how energy efficiency, health and optimum living comfort can go hand in hand.” In addition to automatic CO2 control, residents can set the mechanical extract system to a higher or lower setting, or even to absence mode, as they wish, he says. “To ensure effective central air extraction, a roof fan with an energy-efficient, pressure-controlled motor is being installed above each ventilation shaft. For the air supply to the apartments, a natural system has been chosen, with building-integrated grilles in the façades and windows.”
Communal areas
For ventilation in areas such as the lobby, communal corridors and storage rooms in the car park, STEBOMA is installing a total of seven air handling units. “These air handling units will be located in the technical room in the car park,” says Keesom. “Conditioned air is supplied to the communal areas through a duct system and supply grilles. All the air ducts will be left exposed, which places specific requirements on their installation and finish.” Last but not least, STEBOMA is supplying and installing axial fans and jet fans in the car park. The fans will be connected to the CO/LPG detection system and the fire alarm system installed by the electrical contractor. The final systems are due to be handed over around April/May 2022.
Have a business enquiry for Steboma B.V.? Get in touch
Wie aan Leidsche Rijn Centrum werkte
- consultancyHuygen Installatie AdviseursMentioned in Leidsche Rijn Centrum, Utrecht | Fitting the installations into Leidsche Rijn Centrum
- development consortiuma.s.r. Vastgoed ProjectenMentioned in Leidsche Rijn Centrum, Utrecht | Fitting the installations into Leidsche Rijn Centrum
- development consortiumVestedaMentioned in Leidsche Rijn Centrum, Utrecht | Fitting the installations into Leidsche Rijn Centrum
- maatschappelijk conceptontwikkelaarChange=In this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectLeidsche Rijn Centrum
- SubjectProjects
- CompanySteboma B.V.
- CompanyChange=