Circular and sustainable LAB42 brings businesses, researchers and education together

A remarkable new building opened at Amsterdam Science Park in September: LAB42. In this sustainable, circular hub, covering approximately 12,000 m2, businesses, researchers and education work together on tomorrow’s technology challenges. Welcoming facilities encourage people to meet, share knowledge and exchange ideas across the scientific community, student body, business sector and societal partners, creating a unique ecosystem for Artificial Intelligence and digital innovation. The design for the new building was created by Benthem Crouwel Architects, Strackee, Deerns, Copper8 and DGMR. A project team comprising Visser Smit Bouw BV, Kropman Installatietechniek BV and Unica Building Projects was responsible for its delivery.

“We delivered the complete electrical installation on behalf of Kropman Installatietechniek BV,” says Gerco van Dorp, Electrical Work Planner at Unica Building Projects. “The ambition was to achieve BREEAM-NL ‘Excellent’. Energy-efficient LED lighting, smart sensors and 1,800 solar panels on the roof and south-west façade make an important contribution. Energy meters have also been integrated into the sub-distribution boards to record exactly how much energy each board consumes and how much it feeds back into the system.”
To ensure reliable power distribution throughout the building, Unica Building Projects contacted Hager at an early stage of the project. Van Dorp says: “Hager is a good, reliable supplier, and we are always pleased to work with them on projects. Communication is good, lines are short, and their products stand out for their excellent quality and reliability.” Hager submitted a proposal for the distribution equipment and busbar trunking installation at LAB42. “As soon as the contract was awarded, we developed the distribution equipment in more detail and submitted it for approval,” says Abe de Jong, Project Manager at Hager. “We were then given access to the 3D/Revit building model, in which we modelled the busbar trunking installation.”

100% availability and reliability
To guarantee 100% availability and reliability, the main distribution board had to have two transformer connections. “A rating of 1,600 Ampere was also specified. Based on these requirements and the space allocated in the low-voltage room, we put forward a proposal for the main distribution board,” says De Jong. “We chose a Unimes distribution board in a corner configuration, making optimal use of both the width and length of the room. In addition to two transformer connections, the main distribution board has a bus-tie switch and three outgoing feeders with busbar trunking.”
One busbar trunking run passes through the building riser from the main distribution board to the PV distribution board on the sixth floor. The other two runs supply the sub-distribution boards on the floors. A total of sixteen Univers sub-distribution boards were supplied, powering both the building’s electrical equipment and its lighting. Van Dorp says: “Fourteen sub-distribution boards are installed in the electrical risers. One on the ground floor supplies the kitchen installation, while another in the low-voltage room supplies the emergency lighting panel.” De Jong adds: “A separate PV distribution board was engineered and supplied for the W room to separate the different PV groups. It also ensures that all 1,800 solar panels feed electricity back into the main distribution board.” The PV distribution board was built by Hager panel-building partner DW Multitech Service.

Tested and inspected
Both the main distribution board and the sub-distribution boards were manufactured at Hager’s workshop in Coevorden. “To ensure quality and safety, both installations were tested and inspected at our workshop by a Hager inspector,” says De Jong. “We also carried out a Factory Acceptance Test (FAT) on the main distribution board and the general sub-distribution board.” The electrical installation manager, project manager and site supervisor from Unica Building Projects were present, along with Deerns’ technical supervisor. “Once approved, the main distribution board was split into transportable sections, transported to Amsterdam, moved into the building and reassembled. The electrical connections were then made, followed by a Site Acceptance Test (SAT). The installation was subsequently handed over to the installer.” All sub-distribution boards were delivered to Unica Building Projects’ specifications, just in time and floor by floor, and installed straight away in the risers.
Hager installation partner CableSpace installed all the busbar trunking. “Just before commissioning, we measured the insulation resistance and continuity of all the busbars. We also produced and shared a photographic report showing how each joint had been assembled, torqued and painted. This installation was then certified and handed over to the installer.”
A business enquiry for Hager? Get in touch
Who worked on it
LAB42 in Amsterdam, new build
- verdeelinrichtingen en railkokerinstallatie
Hager - construction teamVisser Smit Bouw BV
- construction teamKropman Installatietechniek BV
- complete electrical installationUnica Building Projects
- designBenthem Crouwel Architects
- designStrackee
- designDeerns
- designCopper8
- designDGMR
- montage van alle railkokersCableSpace
- panel building partnerDW Multitech Service
Keep following this
Get an email when a new story is published. No account needed.
- ProjectLAB42
- ThemeSustainable refurbishment of existing buildings
- SubjectProjects
- CompanyHager
- CompanyVisser Smit Bouw BV
- CompanyKropman Installatietechniek BV
- CompanyUnica Building Projects
- CompanyBenthem Crouwel Architects