Ei Electronics detectors in Zwolle water tower

Smoke detectors in a unique building
In October 2018, installer Hulst Flier was given the opportunity to install smoke detectors in a special building: the water tower on Turfmarkt in Zwolle. This former water tower has been converted into an attractive residential tower with 21 apartments, spread over 11 floors. There is one apartment on each of the first six floors. The top five floors, in the tower’s wider section, have three apartments on each floor.

Ei3000 series: the best series yet
Installer Hulst Flier chose Ei3016 interlinkable smoke detectors from Ei Electronics’ Ei3000 series. These 3000-series detectors require less maintenance and are of the highest quality. Geerhard van Houwelingen, project manager at Hulst Flier Zwolle, is very satisfied with the detectors and with the support provided by Hemmink.
What the installer delivered
Ei3016 smoke detectors were installed in the stairwell and in the living room of every apartment. The smoke detectors in the stairwell are interconnected by wiring. If a fire breaks out in the stairwell or corridor, all the interconnected detectors in the apartments will also sound an alarm.
At least one smoke detector was also installed in the living room of every apartment. If an alarm is triggered in an apartment, it will sound only in that apartment, so the other residents will not be disturbed.
A centrally located Test, Locate and Hush switch, type Ei 1529, was installed on the ground floor to help locate a fire quickly and silence the alarms. If an alarm is triggered, the Locate button immediately identifies which floor the source of the alarm is on (the detector that first sounded the alarm). The detectors on the other floors are silenced immediately during this process, allowing the appropriate action to be taken quickly.
A type Ei128RBU relay is also connected on each floor to control the access doors to the apartments. The relay is connected to all the smoke detectors in the stairwell. If an alarm is triggered, the doors to every apartment close automatically.
About the client
Hulst Flier is an independent full-service installer operating nationwide, with branches in Elburg, Dordrecht and Zwolle. Hulst Flier’s Zwolle branch was involved in the renovation of the water tower in Zwolle and was responsible for installing all the building services. The installation and interconnection of the Ei detectors and all associated equipment in October 2018 were also its responsibility.

Hulst Flier works with clients to achieve financial and social returns for the best possible results. As an accredited training company, Hulst Flier invests in training young people and school leavers, and actively encourages them to consider a career in engineering.
From water tower to residential tower
The water tower is 36 metres tall and has a water reservoir of 500 m3. The new design is based on the tower’s history: it is essentially two towers in one. The original monumental tower, dating from 1892, was stripped of its upper brickwork in the 1950s because it had become structurally unsound, leaving only a stump topped by the water tank. The outer shell of the water tower as we know it today was built around it, including the green copper cap. The new tower follows the outlines of both historic water towers, keeping their history visible.
Construction of the apartments began in 2017, and the project was completed in October 2018.
Een zakelijke vraag aan Hemmink? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeSafe building services and buildings
- SubjectProjects
- CompanyHemmink