The nhow Amsterdam RAI Hotel was officially handed over to its end investor, AXA IM, at the start of this year. Standing 91 metres tall and with a gross floor area of around 43,000 m², the iconic hotel in Amsterdam’s Zuidas business district is the largest newly built hotel in the Benelux, with 650 rooms across 25 floors. The new-build project is being developed by COD, Being Development and NH Hotels in collaboration with OMA. Pleijsier Bouw was responsible for the building work and building services. Blom Elektrotechniek, as a subcontractor to the main contractor, was responsible for the design, supply and installation of the electrical systems.
The electrical systems at the nhow Amsterdam RAI Hotel include earthing and lightning protection, three 1,250 kVA transformers, an emergency generator, a busbar trunking system, a fire alarm and voice alarm system, a data installation with approximately 3,500 connection points and twenty data cabinets, a CAI installation with 670 connection points and a CCTV system, as well as energy-efficient LED lighting.
Electrical installation concept
“During the design phase, we advised Pleijsier Bouw on the electrical installation concept,” says Marco Dekker, project manager at Blom Elektrotechniek. “In close coordination with the various architects and consultants, we made changes to the lighting plan, among other things. This involved not only selecting better, more efficient light fittings, but also changing how they were distributed. We also optimised the energy distribution system.”
Three transformers were installed to distribute power throughout the nhow Amsterdam RAI Hotel, he says. “We then installed two busbar risers, running from transformers 1 and 2 through a services shaft to the 25th floor. A distribution board was installed on each floor to supply the various systems. The third transformer is connected directly to the larger loads installed on the lower floors, such as the sprinkler pump, ventilation units and heat pump.”

Standing 91 metres tall and with a gross floor area of around 43,000 m², the iconic hotel in Amsterdam’s Zuidas business district is the largest newly built hotel in the Benelux, with 650 rooms across 25 floors. (Image: ©egbertdeboer.com).
BREEAM-NL ‘Excellent’
The design and construction were guided by an ambitious BREEAM-NL target. “To meet the BREEAM-NL ‘Excellent’ certification criteria, we supplied a large number of sub-meters,” says Dekker. “We also installed the connections for a public transport information screen in the lobby. Energy-efficient lighting had to be installed throughout the hotel, and it had to be dimmable in accordance with a specific protocol. To meet these requirements as effectively as possible, we installed DALI-dimmable LED lighting connected to a KNX system on the ground floor (entrance hall, lobby and reception), the 1st floor (hotel lounge and bar), the 17th floor (breakfast restaurant and main kitchen) and the 23rd floor (restaurant and conference rooms). The lighting can be easily controlled and managed from a control panel at the central reception desk.”
In the corridors and lift lobbies, motion detectors are connected to the lighting system and control the lighting in four zones on each floor. “The lighting is normally on at 50%. As soon as movement is detected, it switches straight up to 100%, combining optimum visitor comfort and safety with energy efficiency.”
Challenges
Blom Elektrotechniek faced several challenges during the project, including during the structural phase, Dekker explains. “Most of our systems were cast into the concrete walls and floors. However, the exceptionally high quantity of reinforcement made it extremely difficult to fit our systems in properly.” As handover approached, the fire alarm system proved particularly challenging. “This system had to be connected to the sprinkler system, HVAC system, voice alarm system and various security systems, with all the associated testing. The interaction between the systems, the fact that several parties had to work simultaneously in a limited space, and the time pressure called for considerable effort, good coordination and communication, and the ability to stay calm. Thanks to the knowledge and expertise available, the right deployment of people and a no-nonsense attitude, as well as always working respectfully with one another to find solutions, Pleijsier Bouw ensured that we could complete the work in close cooperation with all the parties involved. On behalf of our entire team, our heartfelt thanks.”
Question about this story? Ask your question