Projects

First: RijnlandRoute tunnel systems connected to Rhoon traffic control centre

First: RijnlandRoute tunnel systems connected to Rhoon traffic control centre

A first for the tunnel sector: a full 3 years before opening, the RijnlandRoute tunnel systems have been connected to the traffic control centre in Rhoon.

Today, the systems at the test facility in Eindhoven were connected to the traffic control centre from which the RijnlandRoute will eventually be operated. This means that construction consortium Comol5, together with Rijkswaterstaat, the suppliers and the province of South Holland, can thoroughly test all the systems in advance. As a result, the tunnel on the RijnlandRoute can be brought into use sooner once construction is complete.

COMOL5 RijnlandRoute

At Comol5’s test facility in Eindhoven, 54 subsystem installations have been fully built and interconnected in 24 modules. These include lighting, cameras, emergency telephones and the fire alarm system. By building these systems in modules in advance, any teething problems can be resolved at the test facility, saving a great deal of time later on. Once the civil engineering work on the tunnel is complete, the modules will be installed in the tunnel’s service buildings, leaving only the cabling to be connected. This will significantly reduce testing in the tunnel, which will mainly be limited to physical tests that can only be carried out there.

About the RijnlandRoute and Comol5

Comol5 is an international construction consortium comprising TBI companies Mobilis and Croonwolter&dros, VINCI Construction Grands Projets and DEME Infra Marine Contractors. The RijnlandRoute is a new road connection from Katwijk, via the A44, to the A4 near Leiden. The road will address existing bottlenecks and ensure smooth traffic flows in the Holland Rijnland region, particularly around Leiden and Katwijk. Commissioned by the province of South Holland, Comol5 is responsible for building the new N434, including a bored tunnel, and for modifications to the A4 and A44. Comol5 will also be responsible for the 15-year maintenance of the N434.

Question about this story? Ask your question

Who worked on it

RijnlandRoute

  1. construction consortiumComol5

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectRijnlandRoute
  • SubjectProjects
  • CompanyComol5
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.