Since September, pupils and staff at three primary schools in the Frisian town of Damwoude have been using a modern new home: Campus Damwâld.

Christian primary schools De Fontein and De Bron have merged to form cbs De Sprankeling. Together with public primary school Dr. J. Botkeskoalle and the local sports hall, they are housed under one sustainable roof.

The clients were the municipality of Dantumadiel and Stichting Campus Damwâld, who used Best Value Procurement to select the contractor, Bouwgroep Dijkstra Draisma, and architect, Kristinsson. Ingenieursburo Meijer & Joustra (structural engineer) and Pranger-Rosier Installaties (building services design and installation) completed the project team set up to deliver the project. The schools were designed to meet Frisse Scholen class B requirements; the sports hall was built to NOC*NSF and KVLO requirements.

Clean, green, smart and healthy

The school complex was to be ‘clean, green, smart and healthy’, or, in Frisian, skjin, grien, tûk en sûn. In practical terms, this meant an all-electric building, outdoor spaces that fit the green surroundings, the latest technology to allow for a different use in the future, and a healthy learning environment for pupils and teachers. Gerben Pieterman was part of the project team as project manager for building services contractor Pranger-Rosier Installaties. “As the party responsible for the design, we were able to contribute to the development of the overall design from the outset, which gave us plenty of scope to apply our expertise,” he says.

Campus Damwâld: a new home for three primary schools and a sports hall.

Following the pupils

The building services design also takes account of the building layout and the structure of the school. Pieterman says: “As well as the sports hall and communal areas, the building has twenty classrooms and four learning commons. The classrooms are grouped in pairs, with each pair having its own entrance and cloakroom. We installed a heat recovery ventilation unit for every two classrooms, connected to the central heating and cooling systems. This is a VRV system supplied and installed by Koelvisie. It uses CO2 sensors in the various spaces, allowing the ventilation air supply to follow the pupils’ daily routine, so to speak. The school’s approach is for lessons to start in the group space or classroom, after which pupils continue their day or lesson in the learning commons. The ventilation simply follows them.”

Sports hall

CO2 monitoring is also used in the sports hall. The hall can host school and community celebrations, performances and parties. It has two hundred fixed grandstand seats, plus flexible seating for five hundred people. Pieterman says: “The hall can be divided into three sections, and here too, the air handling is controlled by CO2 monitoring. The sports hall’s air handling system has a total ventilation capacity of 20,000 m³/h. That is why there is an air handling unit on the roof the size of a sizeable mobile home.” The 858 solar panels on the roof provide the required electricity.

“We have certainly been pleasantly surprised by the project’s Best Value approach and the result,” Pieterman concludes. “Our own insights and expertise enabled us to shape the building services, with sustainability and user satisfaction at the heart of the design.”        

Project details

Client 
Gemeente Dantumadiel
St. Campus Damwâld

Architect 
Kristinsson Architecten

Engineer 
Ingenieursburo Meijer & Joustra

Contractor 
Bouwgroep Dijkstra Draisma

Building services contractor 
Pranger-Rosier Installaties

Question about this story? Ask your question

Wie aan Campus Damwâld werkte

  1. ClientGemeente DantumadielIn this story
  2. ClientStichting Campus DamwâldIn this story
  3. architectKristinsson ArchitectenIn this story
  4. structural engineerIngenieursburo Meijer & JoustraIn this story
  5. contractorBouwgroep Dijkstra DraismaIn this story
  6. installerPranger-Rosier InstallatiesIn this story
  7. VRV IV heatrecoverysysteemDaikinMentioned in Bespoke climate control systems for Campus Damwâld
  8. climate control systemsKoelvisie BVMentioned in Bespoke climate control systems for Campus Damwâld
  9. installerPranger-RosierMentioned in Bespoke climate control systems for Campus Damwâld

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectCampus Damwâld
  • SubjectProjects
  • CompanyGemeente Dantumadiel
  • CompanyStichting Campus Damwâld
  • CompanyKristinsson Architecten
  • CompanyIngenieursburo Meijer & Joustra
  • CompanyBouwgroep Dijkstra Draisma
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.