Giant, Lelystad | Installations at Giant distribution centre and the OBO principle

Bicycle manufacturer Giant is working hard to strengthen its market position in Europe. One example is the construction of a 22,000-square-metre distribution centre right next to the factory. Production, assembly, storage and e-commerce are integrated under one roof. The new building on Pascallaan in Lelystad opened at the beginning of September. Unibouw of Gemert was the main contractor, while vanPanhuis Hoogeveen, part of Top Installatiegroep, designed and installed the climate control and electrical systems and is responsible for their maintenance and management. All in accordance with its own OBO principle.
For Peter Moddejongen, project manager at vanPanhuis Hoogeveen, the OBO principle is central to the way Top Installatiegroep works. “OBO stands for Design, Build and Maintain. When you design the systems yourself, you have more freedom in your choices and can maintain control over quality. If you are also responsible for maintenance, you take greater care during the design and construction phases, are more motivated to deliver a good product for the client and are even more focused on preventing failures and rework. You could say that life-cycle thinking is in our DNA. We are also a full-service building services contractor, and designed and installed the complete system for Giant.”
No-nonsense
Top Installatiegroep became involved in the project through the client, Unibouw. The building services contractor works with regular partners and suppliers. Moddejongen: “We have been doing business with our regular partners for years, and are very satisfied with them. They are no-nonsense companies with the down-to-earth attitude of the north of the Netherlands, and they do what they say and promise.” vanPanhuis Hoogeveen is part of Top Installatiegroep, alongside Drenth Installatietechniek and TOP Technisch Beheer, which handles maintenance and management.
Smart construction
During the design phase, Top Installatiegroep’s engineers ensure that construction can proceed in a smart, systematic way. This means using pre-assembled and prefabricated components wherever possible. BIM and tight scheduling take care of the rest. For example, the heat pumps were delivered with the necessary fittings already installed and made operational in a short time. They supply heat to the underfloor heating beneath part of the warehouse floor, and provide both heating and cooling to the office area.
Technology
The roof houses an air handling unit that provides balanced ventilation for the offices, as well as 620 PV panels with a peak output of 186 kW. This covers approximately the distribution centre’s electricity needs. Much of the power is used to charge the many trucks and high-reach trucks at the 40 charging stations in the warehouse. These manned vehicles follow inductive loops in the floor to and from their destinations in the warehouse.
“Naturally, LED lighting has been installed throughout,” says Moddejongen. “This includes linear lighting in the warehouse, recessed spotlights in the suspended ceilings of the offices and, of course, outdoor lighting to keep the site safe and well lit. We can once again be proud of the end result and are entering the maintenance phase with confidence.”
Question about this story? Ask your question
Who worked on it
Giant distribution centre in Lelystad
- main contractorUnibouw
- installerTop Installatiegroep
Keep following this
Get an email when a new story is published. No account needed.
- ProjectGiant distribution centre
- SubjectProjects
- CompanyUnibouw
- CompanyTop Installatiegroep