Construction of the new, large-scale European sorting centre for parcel carrier DPD Nederland at Westfields business park in Oirschot, near Eindhoven, is complete. ‘HUB Eindhoven’ comprises a distribution hall of approx. 18,000 m², with an office of approx. 3,000 m² above it, spread over three floors. A three-storey car park for 49 delivery vans and 230 cars has also been built. The new development occupies approx. 88,000 m² in total. A further 36,000 m² expansion is possible at a later stage. At the heart of the sorting centre is a state-of-the-art 900-metre sorting system with a peak capacity of 50,000 parcels per hour.

Working with VolkerWessels companies SDK Vastgoed, Systabo, WSP Infra, Aveco de Bondt and Stam + De Koning, HOMIJ Technische Installaties delivered the new sorting centre. “We were responsible for the electrical and mechanical services on this project,” says Ronald Driessen, Project Manager at HOMIJ Technische Installaties. “Everything from the energy supply and data network to the fibre-optic cabling, fire alarm and evacuation system, lightning protection system and LED lighting. And from heating to air handling and cooling, rainwater drainage, gas fire suppression and all the sanitary installations.”

One point of contact for all air handling and cooling

Commissioned by HOMIJ Technische Installaties, Western Airconditioning supplied, among other things, a chiller and air handling unit, as well as various fan coil units, split-system air conditioners and heat recovery units. “This meant we had just one point of contact for all the air handling and cooling in the sorting centre,” says Driessen. “That brought logistical benefits and also made it possible to coordinate the building services optimally.” All the equipment was delivered to the project in phases, he says, after which HOMIJ carried out the installation. Western Airconditioning then handled the refrigeration installation and related work for the split-system air conditioners and close control air conditioner, as well as commissioning the systems.

HUB Eindhoven DPD Nederland

The central chiller installed outdoors.

Efficient heat recovery, high performance

A central chiller with a capacity of 170 kW has been installed on the roof of the new building. “It supplies an air handling unit with an airflow rate of 15,000 m³/h,” says François van Gorkom, Account Manager at Western Airconditioning. “A thermal wheel, with a temperature efficiency of over 77% and a moisture recovery efficiency of over 54%, enables optimal heat recovery. This means we comfortably meet the Ecodesign requirements.” The air handling unit and chiller are connected to the fan coil units installed in the office area. “We supplied a total of 39 fan coil units, each with a cooling capacity of 1.5 kW, which had to meet stringent noise requirements. That was no problem for our Calmo units, designed for use in hotel rooms, hospitals and homes where low noise levels are important. The units come as standard with an integrated silencer and acoustic insulation plenum, resulting in a noise level of < 24 dB(A).”

Precise control of temperature and relative humidity

Four driver’s rooms and a control room have been set up on the ground floor. These so-called elbow spaces are where drivers and floor staff can work, rest and shower. Western Airconditioning supplied local heat recovery units for these spaces, with airflow rates ranging from 300 to 800 m³/h. “We supplied nine units in total,” says Van Gorkom. “The heat recovery units feature a counterflow heat exchanger, ensuring high efficiency of > 85%.” Each ‘elbow’ has its own Satellite Equipment Room (SER), fitted with a Western Airconditioning split-system air conditioner. “The Main Equipment Room (MER) has a close control air conditioner to ensure precise control of temperature and relative humidity. It supplies conditioned air beneath the raised floor, with special grilles then distributing the air optimally around the server racks. The air conditioner has a cooling capacity of 20 kW and uses the environmentally friendly refrigerant R410A for optimum efficiency.”

Question about this story? Ask your question

Who worked on it

HUB Eindhoven in Oirschot

  1. E- en W-techniekenHOMIJ Technische Installaties
  2. lucht- en koeltechniekWestern Airconditioning

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectHUB Eindhoven
  • ThemeHealthy indoor air
  • SubjectProjects
  • CompanyHOMIJ Technische Installaties
  • CompanyWestern Airconditioning
Share this article

Advertisement

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.