Innovative and sustainable building services for the ‘retail icon of the Netherlands’

Construction of Westfield Mall of the Netherlands was completed and handed over to client Unibail-Rodamco-Westfield (URW) at the end of October. The official opening is scheduled for March 2021.
A range of changes will still be made over the coming period to meet the requirements of the various retailers. Roodenburg Groep is responsible for all the mechanical building services on the project, from the aquifer thermal energy storage system to the delivery sets, underfloor heating, air handling, car park ventilation and building controls.

“The aquifer thermal energy storage system comprises 2 warm and 2 cold wells, each with a capacity of 100 m³/h,” says Ferry van de Kamp, mechanical project manager at Roodenburg Groep. “Water is transported from these wells to a plant room on the north side of the project. Transfer pumps carry the water to a central atrium, where a large manifold is installed. From this manifold, heat and cold are distributed throughout the shopping centre via ring mains. We have equipped every shop with a delivery set and pumps that draw water from the ring mains.” The retailers themselves have provided any heat pumps and heat emitters, he explains. “Because the ring mains are hydraulically decoupled from the generation system, the various retailers can exchange surplus heat or cooling with one another. All 178 delivery sets are connected to an extensive building management system, which provides real-time readings of faults, flow rates and temperatures, and enables meter readings to be used for billing.”
Connection to river water main
Roodenburg Groep was initially due to install dry coolers to regenerate the aquifer thermal energy storage wells. “However, during the project, a connection was made to Dunea’s river water main, which runs from the rivers Maas and Lek to the dune area. River water cooling is used not only to balance the wells, but also to provide free cooling for the aquifer thermal energy storage system during extreme peak loads. This does not adversely affect drinking water production. By choosing aquathermal energy as the cooling system, the shopping centre’s CO2 emissions can be reduced by a further 10%.”

Air handling
The rooftops of the buildings house 31 air handling units, which provide air handling for the concourses, catering and retail spaces across the 13 buildings. “The air handling units, with air volumes ranging from 10,000 to 80,000 m³/h, each have their own controls and heat pumps, and actively recover heat,” says Van de Kamp. “The catering units incorporate cross-flow heat exchangers and activated carbon filters to prevent the transfer of odours, moisture and dust.” The air ducts serving the concourses are installed across the rooftops. “In the concourses themselves, bulkheads with nozzles have been installed to supply fresh air. Air distribution is controlled on the rooftops, where the constant volume controllers are readily accessible for commissioning, servicing and maintenance.” The air ducts for the catering and retail spaces are installed in the service corridors, with connections and balancing dampers for each retail unit. All the mechanical building services at Westfield Mall of the Netherlands are integrated into a building management system, which also displays fault alerts from escalators and lifts, among other systems.
Project details
Client URW (Unibail-Rodamco-Westfield)
Project management DVP (Diepenhorst de Vos en Partners)
Building services consultant Techniplan
Architect MVSA Architects, …,staat, Heyligers design + projects and Saguez & Partners
Demolition Vlasman
Excavation and earthworks Sterk
Shell contractor Ballast Nedam
Façade works TGM
Revolving doors Boon Edam
Vertical transport systems Otis
Building services Roodenburg Groep (mechanical), Energietechniek (electrical), Trigion (sprinklers) and Hoogendoorn (sanitary)
Thermal, acoustic and fire-resistant insulation and finishes W. van den Hanenberg BV
Aquifer thermal energy storage Tjaden (wells) and Danfoss (delivery sets)
Pumps Grundfoss
Underfloor heating TCS
Air handling units OC Verhulst
Air ducts Vink Systemen
Fans Systemair
Car park ventilation HCPS
Split units Schilt (SER and refrigerated waste rooms)
Controls Webeasy
Control cabling Visser Elektrotechniek
Construction period 2017-2020
A business enquiry for Systemair? Get in touch
Wie aan Mall of the Netherlands werkte
- designMVSA ArchitectsMentioned in Mall of the Netherlands, Leidschendam | Innovative mechanical services for the future ‘retail icon of the Netherlands’
- cascobouwBallast NedamMentioned in Mall of the Netherlands, Leidschendam | Innovative mechanical services for the future ‘retail icon of the Netherlands’
- mechanical installationsRoodenburg GroepMentioned in Mall of the Netherlands, Leidschendam | Innovative mechanical services for the future ‘retail icon of the Netherlands’
- ventilation systemVink SystemenMentioned in Mall of the Netherlands, Leidschendam | ‘Extensive ductwork gives Mall of the Netherlands room to breathe’
- gebouwbeheersysteem
WebeasyMentioned in Mall of the Netherlands, Leidschendam | 32 servers and 215 interface units for shopping centre in Leidschendam - clientUnibail-Rodamco-Westfield (URW)Mentioned in 178 plug-and-play heating and cooling substations for Westfield Mall of the Netherlands
- adviserTechniplanMentioned in 178 plug-and-play heating and cooling substations for Westfield Mall of the Netherlands
- luchtbehandelingskasten en warmtepompenOrange Climate (OC) VerhulstMentioned in 31 air handling units and 90 heat pumps deliver 450,000 m³/h of conditioned air
- sanitary installationsHoogendoornMentioned in Sanitary installation specialist installs more than 57 km of pipework at ‘DE Mall’
- Project managementDVP (Diepenhorst de Vos en Partners)In this story
- architectHeyligers design + projectsIn this story
- architectSaguez & PartnersIn this story
- SloopwerkzaamhedenVlasmanIn this story
- Bouwkuip en grondwerkzaamhedenSterkIn this story
- GevelwerkzaamhedenTGMIn this story
- TourniquetsBoon EdamIn this story
- Verticale transportinstallatiesOtisIn this story
- sprinklerTrigionIn this story
- heat interface unitsDanfossIn this story
- PumpsGrundfossIn this story
- VloerverwarmingTCSIn this story
- LuchtbehandelingskastenOC VerhulstIn this story
- ParkeergarageventilatieHCPSIn this story
- RegelbekabelingVisser ElektrotechniekIn this story
- kunststof transportleidingenWilsta PrefableidingenMentioned in Plastic distribution pipework for ‘DE Mall’: diffusion-tight and prefabricated wherever possible
Keep following this
Get an email when a new story is published. No account needed.
- ProjectMall of the Netherlands
- SubjectProjects
- CompanySystemair
- CompanyDVP (Diepenhorst de Vos en Partners)
- CompanyHeyligers design + projects
- CompanySaguez & Partners
- CompanyVlasman