Project MindLabs has it all: new construction, transformation and building in the middle of the station area, up against the existing LocHal and 'around' the existing steel trusses of Hal 70.
Project MindLabs has it all: new construction, transformation and building in the middle of the station area, up against the existing LocHal and 'around' the existing steel trusses of Hal 70.

The new home of MindLabs is being built at Locomotiefboulevard 101-119 in Tilburg, right next to the iconic LocHal. MindLabs is a collaboration between Fontys Hogescholen, Tilburg University, DPG Media and onderwijsgroep Tilburg/ROC Tilburg. The MindLabs partners are jointly developing technologies that interact with human behaviour, in other words, human-centred AI. The focus is on artificial intelligence technologies such as robotics & avatars, mixed and virtual reality, serious gaming, natural language and data technologies. MindLabs aims to use the unique capabilities of these technologies to help address societal challenges.

Project MindLabs brings together new-build construction, renovation and building in the heart of the station district, alongside the existing LocHal and around the existing steel trusses of Hal 70. Ballast Nedam Zuid and BINX Smartility are jointly responsible for delivering the 12,000 m² complex, designed by Ector Hoogstad Architecten. Wherever possible, they are working with trusted partners such as WAGO. “In the past, we mainly engineered and supplied plug-and-play solutions for BINX Smartility,” says Gijs Knobbe, Specialist Building Automation at WAGO. “For this project, however, we were approached to control the lighting. We supplied the hardware and software for the lighting management system. We also helped work out how the various systems could be integrated. This ranged from integration with the building management system to the motion sensors in the rooms. For example, how could we ensure that the lighting and climate control systems were not left on unnecessarily?”

MindLabs will be a new gem in the Spoorzone, giving educators and businesses plenty of room to research the world of tomorrow.

Complete system integration

“We worked with several companies to take lighting management on this project to the highest level,” says Knobbe. He cites motion and daylight sensor supplier ESYLUX and system integrator InstaVer Systems as examples. “A third company joined the project as it progressed. VanLien/ABB supplied the emergency lighting, which was also connected to our lighting management system. Our system uses Digital Addressable Lighting Interface (DALI) technology, and all our products are DALI-2 certified. As the emergency lighting also had a DALI interface, it could be connected easily using the same 2-wire infrastructure. This was a major advantage for the installer, who no longer needed to run separate emergency lighting cables.” The motion and daylight sensors are connected to the building management system and climate control systems via the lighting management system, he explains. “This means that only rooms with people in them are climate-controlled, preventing energy waste.”

The motion and daylight sensors are connected to the building management system and climate control systems via the lighting management system. This means that only rooms with people in them are climate-controlled, preventing energy waste.

More than 2,500 luminaires

WAGO supplied a total of ten DALI controllers to control the lighting and read data from the emergency lighting, motion sensors and daylight sensors. It also supplied more than fifty DALI Multi Master modules (DALI lines), says Knobbe. “An average of fifty luminaires are connected to each line. This means the complete system controls around 2,500 luminaires.” In addition to the hardware, WAGO also supplied standardised software. The system integrator was able to commission the complete system easily using a standard web browser. “The system integrator first completed a short software training course. We also supported panel builder Distripoint Systemen. Which WAGO components, for example, needed to be installed in each distribution board? And what was the best way to do this? The distribution boards were delivered to the site fully fitted with our equipment, so BINX Smartility could install them straight away.” MindLabs is scheduled for completion at the end of 2022.   

Have a business enquiry for WAGO? Get in touch

Who worked on it

MindLabs in Tilburg

  1. lichtmanagementsysteemWAGO
  2. ClientGemeente Tilburg
  3. ClientFontys Hogescholen
  4. DesignEctor Hoogstad Architecten
  5. ConstructionBallast Nedam Zuid
  6. ConstructionBINX Smartility
  7. Bewegings- en daglichtsensorenESYLUX
  8. Emergency lightingVanLien/ABB
  9. System integratorInstaVer Systems
  10. VerdeelkastenDistripoint Systemen

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectMindLabs
  • SubjectProjects
  • CompanyWAGO
  • CompanyGemeente Tilburg
  • CompanyFontys Hogescholen
  • CompanyEctor Hoogstad Architecten
  • CompanyBallast Nedam Zuid
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.