Projects

Lammermarkt Car Park | Leiden

Lammermarkt Car Park | Leiden

‘Bespoke distribution boards provide Lammermarkt Car Park with sufficient power’

Completed in April 2017 after 2.5 years of construction, Lammermarkt Car Park is the ‘deepest car park in the Netherlands’ (a full 22.5 metres deep). Within walking distance of Leiden’s historic city centre, it has space for 525 cars and was built by the Combinatie Parkeergarages Leiden Dura Vermeer, Besix. SPIE e-fficient buildings was responsible for all the mechanical, electrical and sprinkler installations, from the ventilation system to the lighting, electric vehicle charging points and distribution boards.

Ramon Hoogendoorn and Albert Karremans beside the distribution board at Lammermarkt Car Park.

Parkeergarage Lammermarkt Leiden

“A 400kVA transformer has been installed at Lammermarkt to provide the car park with sufficient power,” says Ramon Hoogendoorn, project engineer at SPIE e-fficient buildings. “The transformer supplies the main distribution board, which in turn feeds 9 sub-distribution boards. We called on Hager to design, engineer, manufacture, supply and install the distribution boards. We work with them regularly and have built up a very good relationship over the past few years. We know exactly what to expect from each other. Any unexpected issues are dealt with straight away, and they take care of everything for us. This project has confirmed that once again.”

Distribution boards
“Commissioned by SPIE and working from the project specifications, we drew up and discussed a design for the main distribution board and the sub-distribution boards. We worked closely with our other contractors to ensure our products would integrate seamlessly,” says Ed Kooijmans, account manager at Hager. “We fitted the main distribution board with a 400kVA generator connection and all the necessary switching equipment, including two motor-operated air circuit breakers for switching between the mains supply and the standby generator. We opted for a Form 4B distribution board, the safest configuration for installers. All live parts are carefully screened. The sub-distribution boards each have a priority and a non-priority section, ensuring that all critical installations remain energised if the standby generator is switched in. All priority sections are fitted with high-quality red covers, manufactured in-house by Hager.” At the preliminary stage, Hager also carried out a selectivity study to ensure that, in the event of a short circuit, only the affected final circuit would trip.

Factory Acceptance Test
“Once the design had been approved, we prepared the final drawings and built the distribution boards,” says Kooijmans. “Before delivering the main distribution board, we carried out a FAT (Factory Acceptance Test) at our site in Coevorden, which SPIE also attended.”

As well as designing, building and delivering the equipment to the project, Hager also handled the internal transport and positioning of the distribution boards on site. “To make internal transport as straightforward as possible, all the distribution boards were delivered in manageable sections, taking account of the structural and technical challenges in the car park.”

Words: Lieke van Zuilekom    |    Image: Hager
Featured image: Ed Kooijmans (Hager), Albert Karremans (SPIE) and Ramon Hoogendoorn (SPIE) in Lammermarkt Car Park in Leiden.

A business enquiry for Hager? Get in touch

Who worked on it

Lammermarkt car park in Leiden

  1. verdeelinrichtingenHager
  2. werktuigbouwkundige, elektrotechnische en sprinklerinstallatiesSPIE e-fficient buildings

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectLammermarkt car park
  • SubjectProjects
  • CompanyHager
  • CompanySPIE e-fficient buildings
Share this article

Advertisement

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.