LocHal, Tilburg | ‘The building and building services at LocHal are perfectly coordinated’

Building and building services have always been separate links in the construction chain. BINX Smartility’s view, however, is that the best performance can only be achieved by integrating design, construction and maintenance. “We approach the process not as a chain, but as a rope, with all the fibres interwoven from start to finish,” says innovation manager Remco Balvert. “We have delivered impressive results in projects including the new Focus Filmtheater in Arnhem, the renovation and extension of the UW Werkbedrijf in Utrecht, and the extensive refurbishment and extension of LocHal in Tilburg.”

The large hall near Tilburg station, where locomotives were once repaired, reopened in December 2018. The building is now home to Bibliotheek Nieuwe Stijl, Seats2Meet and Kunstloc Brabant, among others, as well as various spaces for musical performances, Stadscafé and Stadsbalkon. “The diversity of its functions, combined with the scale, complexity and BREEAM ambition of the project, made LocHal ideally suited to a UAV-GC approach,” says Balvert. “This not only gives the client a single point of contact for the entire project, but also ensures optimal coordination between the building and building services.”
Integrated project approach
Commissioned by the municipality of Tilburg, BINX Smartility carried out the necessary demolition work. “We then added a city balcony, renovated the façade and delivered the fit-out,” says Balvert. “From the stair landscape to the integration of the various spaces, including the electrical, mechanical and sanitary installations, all of which were newly installed.” To ensure optimum climate control and manage energy consumption, LocHal was divided into four climate zones, he explains. “A lower temperature is permitted in the two-metre-deep area in front of the single-glazed lantern façade, as well as in spaces without workstations.” Most of LocHal is heated and cooled using air. “Fan coil units have been installed in all enclosed spaces. Underfloor heating and cooling were chosen for the first, second and third floors. A total of 1,278 solar panels provide renewable energy. The project also involved installing 1,326 LED luminaires, approximately 2.5 km of cable trays and 1,147 sockets.”

Virtual insight and oversight
To give the municipality of Tilburg a virtual view of the new building in advance and ensure smooth delivery, BINX Smartility carried out all its work using BIM. “Our own engineers modelled and developed the design, using the preliminary design by CIVIC architects, Braaksma & Roos architecten, Arup and Inside Outside as the aesthetic starting point,” says Balvert. “Given the complexity of the project and our client’s evolving requirements, the BIM process did not proceed entirely linearly. At times we had to take a step back, but LocHal was no exception in that respect. BIM projects require clients to make many decisions early on, which is certainly no easy task. By providing a virtual view of the building and building services at every stage, we hope to support them as effectively as possible.”
BINX Smartility translated the design model into a construction and engineering model, which also incorporated the discipline models from various suppliers. These included Ferrocal and Fire Stop Holland, who worked with BINX Smartility’s engineers to develop the project in BIM. “We then carried out various model checks, including visual checks for buildability and fit, as well as a range of clash detection checks.”

From AutoCAD to Revit with Stabicad
BINX Smartility consistently uses Stabicad for Revit on its BIM projects. Balvert says there is a good reason for this. “We had been using Stabicad for AutoCAD for several years and were very happy with it, so we decided to use Stabicad for Revit too. The two software packages have a lot in common, which significantly lowered the barrier to switching. Stabicad for Revit offers a range of useful features that we use extensively on our BIM projects. These include the MEPcontent library and the ability to quickly create distribution board layouts. The layouts comply with NEN requirements, and any design changes are automatically recalculated, saving valuable design time.”
Een zakelijke vraag aan Ferrocal? Get in touch
Who worked on it
LocHal in Tilburg
- bouw en installatietechniekBINX Smartility
- clientmunicipality of Tilburg
- voorlopige ontwerpCIVIC architects
- voorlopige ontwerpBraaksma & Roos architecten
- voorlopige ontwerpArup
- voorlopige ontwerpInside Outside
Keep following this
Get an email when a new story is published. No account needed.
- ProjectLocHal
- SubjectProjects
- CompanyBINX Smartility
- Companymunicipality of Tilburg
- CompanyCIVIC architects
- CompanyBraaksma & Roos architecten
- CompanyArup