Last summer, Lorentz Lyceum moved from its former site on Groningensingel to a new building on Metamorfosenallee, next to Arnhem-Zuid station. Ferrocal was responsible for modelling, manufacturing, installing and insulating the air ducts and ventilation ducts, based on information provided by its client and in line with the latest Frisse Scholen requirements. “A healthy indoor climate starts with a considered air technology design and system,” says Ronald Smit, director of Ferrocal.
Ferrocal manages the entire air distribution systems supply chain. “We design based on information from our clients and manufacture everything in-house at our facility in Brummen, as we have done since 1933,” says Smit, with justifiable pride. “A good system is airtight and sustainable. That means the ducts must produce as little noise as possible and meet the quality requirements set out by Luka, the Dutch Association of Air Duct Manufacturers. Commissioned by Pola Installatietechniek Zevenaar, we modelled the air ducts and ventilation ducts for Lorentz Lyceum in our own Revit library at LOD 400. The major advantage is that our clients can also model using this Revit library, and once the model is complete, the data can be used to control our production. We are always happy to invite our clients and end users to visit our production facility.”
Airtightness class C
For Lorentz Lyceum, Ferrocal supplied approximately 2,600 m² of rectangular sheet steel air ducts, all sendzimir galvanised, plus 670 linear metres of round sheet steel air ducts with a maximum diameter of 315 millimetres. “We can supply the round ducts from stock, while the rectangular ones are always made to measure,” says Smit. “We also installed all the accessories, including fire dampers, volume control dampers and attenuators, selected and supplied by our client. The air ducts installed meet airtightness class C. This means that as little air as possible is lost during transport. Class C allows for a leakage rate of just 0.27 l/s/m².”

Cleaner air
All air ducts manufactured by Ferrocal meet airtightness class C as standard. Smit: “For hospitals and cleanrooms, we go a step further and in some cases apply class D, in line with the requirements of our trade association. The benefits of airtightness class C are significant. Fewer leaks mean less noise and lower energy consumption. It also creates a cleaner space and a cleaner extraction system. In other words, a better indoor climate, a sustainable building and, although this has yet to be proven, potentially fewer absences due to illness thanks to cleaner air.”
On-site leak test
The installation’s practical performance is tested by means of an on-site leak test in the presence of the client. Albert-Jan Kistemaker, project manager at Ferrocal: “We comfortably achieved airtightness class C at Lorentz Lyceum. The main challenge was coordinating the different disciplines and meeting the schedule. Close coordination with Pola Installatietechniek ensured everything went smoothly, resulting in a satisfied client. Not least because staff and pupils are assured of a healthy indoor climate that meets the latest Frisse Scholen requirements.”
CSR
Ferrocal works to deliver sustainable buildings and a good indoor climate in non-residential construction, from schools and offices to swimming pools, sports complexes and hospitals, as well as in housing and industry. “We design based on information from our client, and model, manufacture, supply, install and insulate air ducts. So we manage the complete process from A to Z, and do so in an environmentally responsible way. Sustainability and CSR are important benchmarks at every level of our organisation. We also work to give people with different abilities (that is, people who are disadvantaged in the labour market, ed.) the opportunity to participate in the workforce,” Smit concludes.
Een zakelijke vraag aan Ferrocal? Get in touch
Wie aan Lorentz Lyceum werkte
Keep following this
Get an email when a new story is published. No account needed.
- ProjectLorentz Lyceum
- SubjectProjects
- CompanyFerrocal