In November, VSH/Aalberts Industries will move into its new, modern and sustainable distribution centre in Zeewolde. The approximately 35,000 m² new-build facility on the Trekkersveld III industrial estate was completed in just 10 months, in accordance with the BREEAM-NL ‘Very Good’ certification criteria. The building services installed by vanPanhuis Hoogeveen made an important contribution to this achievement.

All office areas are equipped with a VRV IV heat recovery system. This VRV variant enables the different office areas to be heated and cooled simultaneously, with warm or cool air efficiently reused and exchanged between them.

VanPanhuis Hoogeveen was responsible for the design and installation of all building services. These include heating, cooling, ventilation, plumbing, sanitary facilities and the building management system, as well as power distribution, data cabling, lighting, security and CCTV systems, the PV system and access control. “We have equipped all the office areas with a VRV IV heat recovery system,” says project manager Gerard Koops. “This VRV variant enables the different areas to be heated and cooled simultaneously, with warm or cool air efficiently reused and exchanged between them. In addition, low-temperature hydroboxes have been installed in the offices. These transfer heat or cooling from the VRV system to the heating water for the underfloor heating, resulting in optimum energy efficiency. A mechanical ventilation system with heat recovery provides a constant supply of fresh outdoor air and removes polluted, humid indoor air. To reduce energy consumption, all areas with highly variable occupancy are equipped with CO2 sensors and VRV dampers, enabling demand-controlled ventilation.”

The aisles in the storage area/warehouse are fitted with motion sensors, so that lighting is not left on unnecessarily anywhere.

A combination of cabling and busbar trunking

The industrial hall, which comprises both storage and assembly areas, is fully equipped with underfloor heating, Koops explains. “For power distribution, we opted for a combination of cabling and busbar trunking. At Pleijsier Bouw’s request, we installed all the cabling for the building services at a height of 13 metres. We also engineered and installed a number of busbar trunking systems with tap-off points as additional work for VSH/Aalberts Industries, to supply power to the various production machines. Three busbar trunking systems were installed at a height of approximately 5 metres, making it easy to transmit high power loads over long distances, without the risk of voltage losses.”

Ductwork in the new VSH/Aalberts Industries distribution centre in Zeewolde.

Waste is prevented

As the offices are largely fitted with curtain walls, cable trays were not an option. “Instead, we installed power poles,” says Koops. “We fitted various power and data outlets above the ceilings, allowing the poles to be positioned flexibly throughout the rooms.” LED lighting has been installed in both the offices and the industrial hall. “The aisles in the storage area/warehouse are fitted with motion sensors, so that lighting is not left on unnecessarily anywhere. To ensure excellent data coverage, we installed a comprehensive data network with several patch cabinets in the industrial hall. We also installed 40 m² of PV panels. All toilet blocks have been fitted with a shut-off valve in the water system, linked to the lighting system’s motion sensor. As soon as employees enter a toilet area, the valve opens automatically and pressure builds up in the water supply. This prevents water being wasted, for example if a toilet keeps running.”

A few weeks after handover, Koops reflects on a challenging but highly successful project that allowed plenty of scope for input and involved excellent collaboration with all the construction partners. “The first pile was driven in September, and just 10 months later we had to hand over our installations. This was no mean feat, as changes were made and additional work added during construction. To keep the budget, quality and schedule on track, we held daily meetings with Pleijsier Bouw and weekly meetings with VSH/Aalberts Industries. We also worked extremely hard, and the result is this magnificent new-build facility.”

Question about this story? Ask your question

Who worked on it

VSH distribution centre Zeewolde in Zeewolde, nieuwbouw

  1. building servicesvanPanhuis Hoogeveen

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectVSH distribution centre Zeewolde
  • SubjectProjects
  • CompanyvanPanhuis Hoogeveen
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.