Oegema, Dedemsvaart | Electrical installations make a significant contribution to Oegema Transport Dedemsvaart BV’s sustainability ambitions

International transport company Oegema Transport Dedemsvaart BV is strongly committed to sustainability. In several phases, traditional fluorescent tubes are being replaced with LED lighting, and solar panels have also been installed on all the building roofs. A total of 8,412 solar panels have been installed, with a combined peak capacity of 2.4 megawatt peak and annual electricity generation of 2.1 million kilowatt-hours.
As the company’s regular electrical installation contractor, Linde Kroon Elektrotechniek BV is closely involved in making Oegema Transport Dedemsvaart BV more sustainable. “In 2016, Zonnegilde BV from Kampen was awarded the contract to supply and install more than 4,000 solar panels on the existing buildings,” says Marc Nijman, director and co-owner of Linde Kroon Elektrotechniek BV. “Zonnegilde BV brought us in to handle the AC side, from the connections to the grid transformer station through to the complete distribution equipment, cabling and connections to the inverters.

Linde Kroon Elektrotechniek BV turned to Hager for the distribution equipment.
Over the past two years, we have also provided the electrical installations for two new warehouses for Oegema Transport Dedemsvaart BV. The latest was completed early this year. Zonnegilde BV was also awarded the contract to supply and install more than 4,500 solar panels here, and once again brought us in to handle the AC side.”
Bespoke distribution equipment
Linde Kroon Elektrotechniek BV turned to Hager for the distribution equipment. “We have always had direct lines of communication with Hager,” says Nijman. “Questions are answered straight away, and the products are very competitively priced. Hager also has a wealth of in-house expertise, which it is happy to share with its customers, including on larger distribution systems of up to 6,000 amperes.” Jan Wassink, account manager at Hager, says: “Together with Linde Kroon Elektrotechniek BV, we visited the site in Dedemsvaart to get a feel for the existing systems, the space available and the potential challenges involved in the project. Based on our findings and the requirements set out by Oegema Transport Dedemsvaart BV, we then designed the distribution installation, taking into account heat generation in the distribution boards and any potential voltage drops. To avoid problems with the inverters, the voltage drop was not allowed to exceed 1%.”

“Based on our findings and the requirements set out by Oegema Transport Dedemsvaart BV, we designed the distribution installation, taking into account heat generation in the distribution boards and any potential voltage drops.”
For the existing buildings, Hager designed two main distribution boards, each rated at 400 amperes, Nijman explains. “Hager panel-building partner PS Nederland built the main distribution boards and delivered them to us, after which our engineers carried out the installation on site. Both main distribution boards have a number of circuits connected directly to the inverters. The grid transformer station supplies the first distribution board, while an existing main distribution board supplies the second.” The installation work took place at the same time as the installation of 2,762 solar panels on the roof of a neighbouring commercial building, also carried out by Zonnegilde BV and Linde Kroon Elektrotechniek BV.
A focus on efficiency and budget
As with the existing buildings, the solar panels on the new buildings were initially to be connected to the central grid transformer. “This was no easy task, given the long distances that had to be covered,” says Wassink. “To avoid excessively long and thick cables, we advised the electrical installation contractor to use busbar trunking. However, this comes at a price, so it was ultimately decided to reduce the distances to the transformer.” Nijman says: “An additional grid transformer station was installed for the new buildings. The transformer was installed right next to the building, allowing the inverters to be connected directly to it using multiple cables. A distribution installation was therefore no longer needed. We did, however, install Hager surge protection devices and isolators in these buildings.”
A business enquiry for Hager? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeBuilding electrical systems
- SubjectProjects
- CompanyHager