Office tower with a park at its heart

A 90-metre-high office building in the heart of the Netherlands, with a real park inside it at a height of 45 metres. It sounds futuristic, but the building was recently completed. Central Park in Utrecht was officially opened by André Kuipers on 6 October. HOMIJ provided all the building services in the office building and car park.
Central Park is right next to Utrecht Centraal station, making it perhaps the most centrally located office building in the Netherlands. What makes the tower truly special is the nature integrated into it, right in the middle of the city. A two-storey park, enclosed by glass, sits at a height of 45 metres. You can take a walk here to unwind from a hard day's work or meet others in a green setting. The view is fantastic too.
To bring even more nature into the building, features have been installed in and around it for various species, including bat boxes and nesting sites for house sparrows and swifts.

Ready for the future
The offices were handed over as shell and core units, allowing tenants to fit out their working environment entirely to their own requirements and with flexibility. Central Park has 23 floors, with an average floor area of 1,300 m2. The building services are designed to be connected both horizontally and vertically, making it easy to accommodate future changes. “We were awarded the contract in July 2018. Following a preparation period, we started work on the foundations and basements in early 2019,” says Ramon van Vliet, project manager at HOMIJ Technische Installaties. “At the start of the project, the team considered the challenges and potential risks as well as the scope. Our assessment identified the short construction period and transport in a dense urban area as potential risks. With a short construction period, you have to install quickly. Prefabricating building services components in our specially equipped workshop gave us a significant advantage here. The fact that this also meant we needed to make fewer transport movements was an added benefit.”
The car park beneath the office building has three levels below ground and two above. The various plant rooms are located on the top three parking levels, including the incoming utility services, the thermal energy storage system and the sprinkler room. These levels also accommodate bicycle parking and logistics facilities.

High energy performance
The sustainability ambitions were high from the outset. The building was constructed to meet the requirements for BREEAM ‘Excellent’. It therefore uses energy-efficient building services, energy and water submeters, energy-efficient lifts and lighting, rooftop PV panels and water-saving measures. The building's energy performance is consequently 21% better than required by the Building Decree. For HOMIJ, this meant addressing a number of challenges. Van Vliet says: “Integrating the building services into the construction was challenging. The weather conditions also made things even more difficult for us. That is one reason why I am very satisfied and especially proud of our team. Construction is a team effort; we worked well together, including with the subcontractors. Together, we delivered the project successfully within all the constraints. The result speaks for itself!”
Question about this story? Ask your question
Wie aan Central Park werkte
- building servicesHOMIJ Technische InstallatiesIn this story
- Mechanical installationsBeck & v.d. KroefMentioned in Central Park, Utrecht: BREEAM ‘Excellent’ rating supported by sustainable plumbing installations
- contractorWessels ZeistMentioned in Central Park, Utrecht: BREEAM ‘Excellent’ rating supported by sustainable plumbing installations
Keep following this
Get an email when a new story is published. No account needed.
- ProjectCentral Park
- SubjectProjects
- CompanyHOMIJ Technische Installaties