Projects

Pan Oston, Raalte | Installing during a growth spurt: ‘I’m only satisfied with the highest quality’

Pan Oston, Raalte | Installing during a growth spurt: ‘I’m only satisfied with the highest quality’

Beekman Elektro supplied all the electrical installations for Pan Oston, a new-build complex with 16,000 m2 of offices and industrial halls. It was the company’s largest project to date. Its scale was in line with the electrical contractor’s growth ambitions. However, the contract was not signed until director Erik Beekman had scrutinised the project from every angle.

“We received the invitation to tender in December 2017,” Beekman says. “I then looked into whether I could bring together enough people to deliver this major project. Could I continue to provide the quality we stand for? Would there still be enough capacity to deliver our ongoing and new projects properly? I only accepted the provisional contract once I could answer all these questions in the affirmative. That was in February 2018.”

Beekman Elektro Pan Oston Installatie Bouw Nederland

Intensive preparation

Beekman Elektro then had six months to design and engineer the Pan Oston project. “That is a short time for a project of this size. At the same time, the company was going through a growth spurt. In 2017, Beekman Elektro had 9 employees; by early 2019, that figure had temporarily risen to 26. We had to manage that carefully. I hired an operations manager, and brought in an external project manager for Pan Oston.”

All electrical installations

The Pan Oston project is now nearing completion, and Beekman Elektro has completed 99.9% of the work. Across the 16,000 m2 site, this includes the complete lighting system, data network, intruder alarm, CCTV, access control, fire alarm and evacuation system, sound system, solar panels and cabling for the building services installations.

Beekman Elektro Pan Oston Installatie Bouw NederlandBeekman Elektro Pan Oston Installatie Bouw Nederland

“The main contractor, Aan de Stegge from Twello, later admitted that it had identified us as the project’s risk factor. After completion, they told me they had never seen everything work first time. That’s down to my perfectionist nature. I’m only satisfied with the highest quality.”

Een zakelijke vraag aan Elektro Internationaal? Get in touch

Wie aan Pan Oston werkte

  1. contractorAan de SteggeIn this story
  2. electrical installationsBeekman ElektroMentioned in Pan Oston, Raalte | Innovative installations with stylish luminaires
  3. solar panelsZonmontageMentioned in Pan Oston, Raalte | Solar panels for Pan Oston in Raalte

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectPan Oston
  • ThemeBuilding electrical systems
  • SubjectProjects
  • CompanyAan de Stegge
  • CompanyElektro Internationaal
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.