The brand-new, multi-purpose Rotterdam Ahoy Convention Centre can host large conferences, concerts and theatre performances, often even at the same time. This places specific demands on the electrical installation. Heijmans asked Hager to help develop a reliable solution.

“Rotterdam Ahoy Convention Centre is a state-of-the-art international conference centre with 35 breakout rooms and the largest auditorium in the Netherlands,” says Corine Dijkhuizen, Manager Facility Services at Ahoy, in Hager’s reference video (youtu.be/dGfVQSC-kkE). “As required, we can also convert this impressive venue into RTM stage, which is suitable for theatre companies, musicals and smaller pop concerts for up to 7,800 standing visitors. What’s more, we can host several events and meetings at the same time. Making this possible required a large team to work very closely together from the design stage onwards. The result is a building that looks different every time, depending on the events and meetings taking place. The new development is therefore a valuable addition to the city of Rotterdam. We have every reason to be PROUD.”

A distinctive feature is the black distribution board in RTM stage, divided into separate sections for sound and lighting.

Flexible solutions

Rotterdam Ahoy Convention Centre is part of the Hart van Zuid development plan. Under this plan, Heijmans is building and renovating various projects with the aim of creating a vibrant city centre where residents, visitors and businesses feel at home. “The flexibility of RTM stage is the result of various contractual requirements,” says Hans van den Nouweland, Lead Engineer at Heijmans. “Working closely with Hager, we devised flexible solutions for a number of locations.” One example is the black distribution board in RTM stage, divided into separate sections for sound and lighting. “At Ahoy’s request, we installed both distribution boards in a very small space in the wall. They are black because they are visible. It was a major challenge, but Hager’s products enabled us to meet it successfully. Hager stands for reliability. We have completed various projects together over the past few years, including projects outside Hart van Zuid. This means we know that the technical issues we raise are addressed and resolved proactively. Our experience together was also the key to delivering a quality installation on this project, in line with Ahoy’s requirements.”

Hager is responsible for supplying the main and sub-distribution boards for this project.

29 sub-distribution boards in just 9 weeks

Hager is responsible for supplying the main and sub-distribution boards for this project. “We were involved with the main distribution boards from the initial design right through to construction, testing, lifting them into position and final handover,” says Martwin de Man, project manager at Hager. “PS Nederland Noord B.V. built all the sub-distribution boards for us. In total, there are 29 Hager univers distribution boards. Our panel-building partner handled the complete design, preparation, assembly and delivery. And all within a lead time of just 9 weeks!” Hager acted as the hub between client Heijmans, its own workshop and PS Nederland Noord B.V. “Together, we looked at how we could deliver this project. The result is a high-quality, bespoke installation, delivered perfectly on time and within budget.” Van den Nouweland is also proud, particularly of all the challenges overcome together. “The fact that Ahoy shares our pride is the icing on the cake.”

A business enquiry for Hager? Get in touch

Wie aan Rotterdam Ahoy Convention Centre werkte

  1. contractors' joint ventureHart van Zuid VOFMentioned in ‘The Rotterdam Ahoy Convention Centre is a major project in every respect’
  2. contractors' joint ventureHeijmansMentioned in ‘The Rotterdam Ahoy Convention Centre is a major project in every respect’
  3. contractors' joint ventureBallast NedamMentioned in ‘The Rotterdam Ahoy Convention Centre is a major project in every respect’
  4. designKraaijvanger ArchitectsMentioned in ‘The Rotterdam Ahoy Convention Centre is a major project in every respect’
  5. hoofd- en onderverdelersHagerIn this story
  6. panel building partnerPS Nederland Noord B.V.In this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectRotterdam Ahoy Convention Centre
  • ThemeIntegrated construction and building services
  • SubjectProjects
  • CompanyHager
  • CompanyPS Nederland Noord B.V.
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.