Projects

Smart innovation shortens construction time

Smart innovation shortens construction time

Student accommodation is familiar territory for Van den Pol Elektrotechniek. “We have installed more than 5,300 units, both prefabricated and traditionally built,” says project manager Theo Severs.

As well as OurDomain Amsterdam South East, the Montfoort-based electrical specialist is involved in recent projects in Utrecht, Essen (D) and Lelystad.

In the first phase of OurDomain Amsterdam South East, Van den Pol installed the electrical systems in the student accommodation and communal areas. “We also took care of the fire detection and alarm system. In addition, we fitted the entire complex with LED lighting, and 284 PV panels have been installed across several roofs.”

Plug-and-play first

Finding ways to work smarter, faster and more safely comes naturally to Van den Pol. “Together with ABB, we developed a plug-in PMK80 meter cabinet connection box. It was used on a large scale for the first time at OurDomain Amsterdam South East, together with the C60 junction box. Both components were assembled off-site and placed on the tunnel formwork. Once the flexible conduits had been connected, the concrete was poured. This significantly reduces construction time, and our installers no longer have to pull or terminate any wires after the pour.” The time savings anticipated in advance have proved realistic in practice, says Severs. “I expect us to use this innovation more often.”     

Question about this story? Ask your question

Wie aan OurDomain Amsterdam South East werkte

  1. developerBlauwhoedMentioned in OurDomain Amsterdam South East: Large numbers of installations delivered in a very short timeframe
  2. architectOZ ArchitectenMentioned in OurDomain Amsterdam South East: Large numbers of installations delivered in a very short timeframe
  3. contractorBouwcombinatie Holendrecht (Wessels Rijssen & Wessels Zeist)Mentioned in OurDomain Amsterdam South East: Large numbers of installations delivered in a very short timeframe
  4. building servicesInstallatiebedrijf G. van Dam B.V.Mentioned in OurDomain Amsterdam South East: Large numbers of installations delivered in a very short timeframe
  5. building servicesDubotechniekMentioned in OurDomain Amsterdam South East: Large numbers of installations delivered in a very short timeframe
  6. building servicesDe Groot InstallatiegroepMentioned in OurDomain Amsterdam South East: Large numbers of installations delivered in a very short timeframe
  7. supply and installationHome-NRGMentioned in 870 solar panels supply residents of North and West House with energy

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectOurDomain Amsterdam South East
  • SubjectProjects